Preview only show first 10 pages with watermark. For full document please download

Start Here Assembly Instructions 22

   EMBED


Share

Transcript

Family: Plantation Drawing 1 - Fixture Assembly Item No. 2222 CB/BB/PL start here 1. Find a clear area in which you can work. 2. Unpack fixture and glass from carton. 3. Carefully review instructions prior to assembly. *** The construction of this fixture will be accomplished by first hanging the fixture from the ceiling, making all necessary electrical connections, and then installing the fixture glass. A SAFETY WARNING: READ WIRING AND GROUNDING INSTRUCTIONS (I.S. 18) AND ANY ADDITIONAL DIRECTIONS. TURN POWER SUPPLY OFF DURING INSTALLATION. IF NEW WIRING IS REQUIRED, CONSULT A QUALIFIED ELECTRICIAN OR LOCAL AUTHORITIES FOR CODE REQUIREMENTS. 1 1. Please refer to the hanging instruction sheet (I.S. 19) provided to continue installation of this fixture. 2 3 1. Thread center stem (1) into bottom of cluster assembly (A). 2. Slide glass (2) and cast bottom (3) onto fixture. 3. Thread finial (4) onto end of center stem (1). • To change bulbs follow steps 2 and 3 in reverse order. 3 Note: Maximum wattage for 2222 fixture is 40 watts per bulb. 4 HINKLEY LIGHTING 12600 Berea Road Cleveland, OH 44111 800.446.5539 / 216.671.3300 www.hinkleylight i n g . c o m 2222 assembly instructions