Preview only show first 10 pages with watermark. For full document please download

Swe 662_v1.1

   EMBED


Share

Transcript

SWE 662 ® CyberResearch LCD Mounting Solutions SWE 662 A C A B J Featuring: ¾ ¾ ¾ ¾ ¾ Bench top Swivel Clamp-Mounting 22lb Max Capacity Six Axes of Motion Up to 3.75"-Thick Mounting Surface ¾ Gas Cylinder Countermeasure D E F H G I STEP 1 Mounting A A. Mounting to Bench Top Hardware Required: A. Arm/Base J B. Mounting Clamp G. T-Handle Wrench J. Mounting Screws Instructions: ƒ ƒ Affix clamp to base with two mounting screws (J.) as shown at right. Bench top should be at least 30mm thick; tighten clamp handles until secured to desktop. B G Version 1.0 CyberResearch, Inc. 25 Business Park Drive Branford, CT USA 1 P: (203) 483-8815; F: (203) 483-9024 www.cyberresearch.com SWE 662 ® CyberResearch LCD Mounting Solutions B. Mounting to Wall Hardware Required: A. Arm/Base ƒ Appropriate Wall Anchors (not supplied) Instructions: ƒ Mark and drill four mounting holes using the arm base as template. ƒ Using the proper wall anchors, mount arm base to wall. STEP 3 Secure Upper Arm to Base C D Hardware Required: C. Upper Arm D. Washers E. Mounting Bolt F. Bolt Cover Figure 1 G. T-Handle Wrench F Instructions: ƒ Align washers (D.) with holes in base, as shown in Figure 1. ƒ Align upper arm (C.) with mounting holes in base, as shown in Figure 1. ƒ Insert mounting bolt (E.) through holes in upper arm and base, as shown in Figure 2 ƒ Tighten mounting bolt using provided THandle wrench (G.). G E Figure 2 CyberResearch, Inc. 25 Business Park Drive Branford, CT USA 2 P: (203) 483-8815; F: (203) 483-9024 www.cyberresearch.com ® CyberResearch LCD Mounting Solutions SWE 662 STEP 4 Attach Display Hardware Required: I I. Mounting Screws Instructions: ƒ If applicable, mount SWC 100 (75mm to 100mm) VESA adapter plate (with included hardware) prior to beginning the subsequent steps. ƒ Align the VESA mounting holes in the display with either the SWC 100 adapter plate, or the SWE 662 (as shown at right). ƒ Insert and tighten screws (I.) as shown. STEP 5 Adjusting Load Capacity Hardware Required: G. T-Handle Wrench Instructions: ƒ Lift the adjustment screw’s access cover, see figure at right. ƒ The adjustment screw is visible when the mounting arm is in a vertical position. ƒ Insert the T-Handle wrench into the head of adjustment screw. ƒ Clockwise decreases load capacity. ƒ Counterclockwise increases load capacity. CyberResearch, Inc. 25 Business Park Drive Branford, CT USA 3 P: (203) 483-8815; F: (203) 483-9024 www.cyberresearch.com SWE 662 ® CyberResearch LCD Mounting Solutions STEP 6 Adjust Resistance Hardware Required: G. T-Handle Wrench Instructions: ƒ Use T-Handle wrench to adjust lateral resistance of monitor’s mount, as shown at left. STEP 7 Cable Management Hardware Required: H. Cable Covers Instructions: ƒ Thread cables through base of arm and connect to display. ƒ Clip cable cover into place to secure loose cables and prevent snags. CyberResearch, Inc. 25 Business Park Drive Branford, CT USA H 4 P: (203) 483-8815; F: (203) 483-9024 www.cyberresearch.com