Transcript
T
ECHNICAL INFORMATION Models No.
6236D/6216D
Description
Cordless Driver Drill
New Tool
9/16")
CONCEPTION AND MAIN APPLICATIONS
243(9-
6236DWAE
Battery 1422 x 2 pcs
6236DWBE
Battery 1433x 2 pcs
6216DWAE
Battery 1222 x 2 pcs
6216DWBE
Battery 1233x 2 pcs
Charger
DC1411
6216D 240mm(9-7/16")
Battery
Model
6236D 244(9-5/8")
Model 6236D and 6216D are 10mm version of existing Model 6336D and 6316D.
Specifications 6236D
6216D Direct current magnet motor Battery 1422 NiCad 14.4V, 2.0Ah Battery 1222 NiCad 12V, 2.0Ah Battery 1433 NiMH 14.4V, 2.2Ah Battery 1233 NiMH 12V, 2.2Ah Speed at no load High speed 0~1300 R/min Low speed 0~400 R/min Chuck capacity 1.5(1/16") - 13(1/2") Drilling capacity Iron works 10mm(3/8") Wood works 30mm(1-3/16") Wood works 36mm(1-7/16") Torque adjusting 16 levels + Direct connection 32 N.m(330 kgf-cm,24ft•lbs) Max. tighten torque 38 N.m(390 kgf-cm,28ft•lbs) Clutch operative torque 1 N.m(10kgf-cm,0.7ft•lbs) - 6 N.m(60kgf-cm,4.3ft•lbs) Motor Battery
Standard equipment
Battery cover ------------------ 1pc (DWAE/DWBE: 2pcs) + - Bit 2-45 ------------------- 2pcs Set Plate
Optional accessories Drill 1.5,2,3,4,5,6 Drill Bit for wood 9,12,15 + Bit 1-65,2-45,2-65,2-110,2-150,2-250,3-45,3-65,3-110 - Bit 5-45,5-82,6-70,6.35-45,8-45,8-70 Socket bit 7-55,8-55,10-55 Buff 125 Rubber pad assembly Wool bonnet100 Grip Assemble, Stopper pole assemble Charger DC1411,DC1801 Battery (NiCad 1422) Battery (NiMH 1433) The stabdard equipment for the tools shown may differ from country to country
94 6") /1 11 (3-
Repair (1) Notes in Disassembly • When exchanging Gear assembly, remove Drill chuck in advance. Speed change lever (If you only dismantle Housing, removal of Chuck is unnecessary.) •When detaching Chuck, hold two-face width of Spindle. •In disassembly, be careful no to lose Compression spring 4 in Speed change lever, because it easily goes away.
(2) Note in Assembly 1 Assembly of Motor and Gear assembly * Since Motor bracket is equipped in Gear assembly for repair, detach Motor bracket from Gear assembly. Be careful that the content may not go out from Gear assembly at that time. 1) Screw Motor bracket to Motor.
Compression spring 4 Figure 1
2) Attach the above 1) Moter with Bracket to Gear assembly. Motor
Gear assembly
Figure 2
2 Installing of Speed change lever 1) Place two Compression spring 4s into Speed change lever. 2) Being careful that Compression spring 4 may not comes out , install Speed change lever assembly in the projection of Change lever as shown in Figure 3. Projection of Change lever Speed change lever
Speed change lever assembly Compression spring 4 Figure 3
Gear assembly
3 Attaching to Housing 1) When attaching a unit of Gear assembly and Motor, etc. to Housing L, place Speed change lever in the position as shown in Figure 4.
Put Speed change lever near to either one side Inside of Housing L Figure 4 4 Assembly of chuck 1) In assembly of Chuck, hold the two-face width and tighten by 50~60 N.m (500~600kgf.cm). •If tightened by the torque less than the above, Chuck may loosen in reverse rotation, which will break Screw for Chuck and Chuck may comes off. •Do not tighten Chuck by low speed lock torque, because you may be swung around and dangerously. 2) Used screw for fixing Chuck is left-handed.
Wiring
diagram Red mark M2
T-
Spring terminal
Switch
T+
Details
Black Direct motor current
M1
Orange
of wiring
Inside of Housing L
Connect Receptacle in the direction as shown here
Make lead wire pass between Pin and Inner wall
Do not put Lead wire on Boss
Direct motor current
Pin
Pin Boss
Boss
Switch Switch
Left side
Pass Lead wire through this part Seen from Rear side
Radiation plate
Connect Receptacle in the direction as shown here
Motor Hoising L
Red mark
Pass Lead wire through this part