Transcript
GB.TBLZ408.070925
Installation, Cover Holding Device, set TBLZ-1-10-07 GOLD sizes 04-08/ COMPACT sizes 02-03
1. Field of application
3. Installation
Holder for the upper inspection panel, GOLD sizes 04–08 and COMPACT Unit sizes 02-03, installed vertically.
Dismount the upper inspection door. Use the inner attachment plate as drill template, place it with the edge to the gable, 148 mm from the outer edge. Drill six holes for 4mm pop rivet. Fit one M8x20 screw and inner attachment plate, fig. 1. Fit the attachment plate onto the inspection door according fig. 2. Fit the cover holding device to the door according fig. 3, fasten the nut by hand force. The cover holding device shall be easy to operate and shall not have too much play. Fit the door to the hinges, fit cover holding device to the inner holder. Check function.
2. Function The holder is intended for mounting at the side of the fan. Mechanical holder with automatic catch for 8 different opening angles. When the door is completely opened, the catch is automatically disengaged. The door must be completely closed to reactivate the function of the catch. By pushing the catches by handforce, the door can also be sunk one step at the time.
Pop rivet4,0x8 ST/ST
Pop rivet 4,0x8 ST/S
Attachment plate Cover holding device Inner attachment plate Fig. 1
Attachment plate
Fig. 2
Screw M6S FZB M8x20H 8.8 Plate BRB 8,4x16x1,5
Nut LDS-NYL GB6 FZB M8
Fig. 3
Specifications are subject to alteration without notice.
www.swegon.com
1