Preview only show first 10 pages with watermark. For full document please download

Timesaver Presentación Power Point Deloitte Chile

   EMBED


Share

Transcript

Delivering Complex Programs with Consistency and Success Program Management Área | March, 2017 Playbook Contents • Chapter 1: Introduction to Program Management • Chapter 2: The PgM Journey ˗ Phase 1 – Imperative ˗ Phase 2 – Operationalize ˗ Phase 3 – Integrate ˗ Phase 4 – Execute ˗ Phase 5 – Sustain Deloitte Delivering Complex Programs with Consistency and Success 2 Expositors Miguel Torres Manager Organizational Project Managemet Deloitte PMO/PPP Operations Services Deloitte Rodrigo Holmberg Manager Organizational Project Managemet Deloitte PPP Consulting Services Miguel Hidalgo Manager Operational Excellence Deloitte Master en Modelos de Gestión Delivering Complex Programs with Consistency and Success 3 Many Forces Drive Organizations to Transform There are many forces driving companies to change how they do business, which is frequently addressed through large, complex, multi-discipline Transformation Programs Successful transformation is not just about responding to individual triggers, but about effective integration and execution across all triggers to deliver the full value of a program Deloitte Delivering Complex Programs with Consistency and Success 4 What is complexity? • There is no simple, widely accepted definition • Complexity theory has been developed across fields including: cybernetics, systems thinking, computer science, engineering, physics, mathematics, earth sciences, sociology and philosophy Truly Complex Projects • Usually adaptive system of systems; • Have high uncertainty in scope definition; • Are distributed (organizationally, geographically, jurisdictionally); • Have ongoing environmental and internal turbulence; • Are most effectively implemented through wave planning; and • Unable to be decomposed to elements with clearly defined boundaries. Deloitte Delivering Complex Programs with Consistency and Success 5 What is complexity? A project’s complexity profile is a summary of inherent project risks and complexities measured across five standard categories and 29 factors; as such, it does not indicate how well a project is being managed. A project’s unique complexity profile drives the degree of focus, governance and control, that should be built into the overall plan. Complexity categories Stakeholders This category gives consideration to the number of stakeholders, how they are aligned, and stakeholder power. Stakeholders include co-venture partners, government organizations, and large subcontractors. Social Factors This section assesses the challenges for the project associated with people change management and interaction between different stakeholders. It considers breadth of change across project roles and the organization and the level of paradigm shift for major stakeholders. The level of multi-disciplinary involvement and cross discipline familiarity is also taken into account. Ambiguity This section assesses the challenges associated with key assumptions, uncertainty, and risk. It also assesses how risk is shared among key stakeholders, and the level of certainty around project costs. Technical Design This section assesses the challenges associated with system changes. Consideration is given to integration complexity, robustness, external technical interfaces, and overall system development complexity. Project Structure & Management This section assesses the challenges for the project associated with the planning, management and execution of project activities. It also assesses levels of accountability, project team experience, schedule complexity, contracting mechanisms, degree of flexibility, timeframes, and cost. Deloitte Measurement scale <4 Business as usual type projects, normally not formalized by most organizations. 4–5 Generally well defined projects undertaken within a business unit. 5–6 Generally core business projects that may be undertaken across several business functions and often have executive-level attention. 6–7 Generally larger projects commonly undertaken across the organization. Normally have board-level attention. 7–8 Generally larger projects commonly undertaken across the organization and create a noticeable impact on the organization. Normally have board-level attention. 8–9 Larger projects that are ambiguous in nature, are seldom undertaken across the organization and create a significant impact within the industry. Has board-level attention. 9 – 10 Largest projects rarely undertaken by organizations that may involve and impact multiple organizations. Delivering Complex Programs with Consistency and Success 6 The need for consistent Program Management Why Programs Fail* 58% of client surveyed indicated that they don't have an assigned business transformation leader to lead their business transformation efforts. It is critical to have a consistent, repeatable approach to transformation program management, as well as a consistent toolset, and qualified and experienced Program Managers. Deloitte Delivering Complex Programs with Consistency and Success 7 Enterprise Transformation Management (ETM) is a framework that facilitates the successful execution of critical activities across all phases Strategy Management Description: Focuses on aligning long-term strategic objectives to transformation efforts that will collectively produce the desired enterprise end-state, with an emphasis on continually monitoring transformation activity based on priorities and impact Communications & Change Management Description: Emphasizes meaningful engagement with key internal & external stakeholders to improve change readiness and ensure that impacts are embraced and sustained throughout the transformation Deloitte Governance Strategy Management Communications & Change Management Governance Enterprise Transformation Management Performance Management & Reporting RiskManagement Management Risk Risk Management Description: Stresses active identification and mitigation of potential barriers to transformation success, with particular attention paid to ownership, executive accountability, and cross-functional impact Description: Emphasizes executive-level visibility to consistently align transformation efforts with strategic vision, and deliberate processes around leading indicators / controls to increase proactivity, accountability, and effectiveness Performance Management & Reporting Description: Tracks progress to business benefits and provides a comprehensive view of transformation impact through real-time executive-level dashboards and regular performance analysis Delivering Complex Programs with Consistency and Success 8 Key Steps of the Transformation Journey Align to the Five Program Management Dimensions By applying the five program management dimensions across the entire Transformation Journey, we can define, plan, monitor, and control the core dimensions of the program. Imperative Operationalize Integrate Execute Sustain Transformation Imperative, Objectives & Guiding Principles Transformation Pipeline Integrated Transformation Roadmap Value Capture Transition and Knowledge Transfer Preliminary Set of Initiatives Governance Framework Implementation Plans Delivery Assurance Program Closure Define Value Expectations Decision Rights Framework Decision-Risk Analysis Executive Reporting Continuous Improvement Anchoring Decisions Risk – Value Analysis Interdependency Alignment Program Health Checks PgM Toolkit, Client Resources, and Supporting Knowledge Key Strategy Deloitte Governance Performance Decision Management Risk Enablers Delivering Complex Programs with Consistency and Success 9 PgM for Waterfall vs. Agile Projects When should a project be Waterfall vs. Agile? Spectrum of Agility Waterfall Well defined Predictive Low Well understood Specialized Deloitte Hybrid Agile Scope Planning Culture Need for Flexibility Technology Team Composition Agile Ongoing prioritization Adaptive High Uncertain Cross-functional Delivering Complex Programs with Consistency and Success 10 Agile and Program Management The potential Dilemma for Program Managers PgM Challenge – Combining Agile, Waterfall & Hybrid Agile Projects in a Program Project 1 - Agile Agile is characterized by: • Estimated scope with fixed time and resources • Requirements elaborated during sprints • Flexibility – changes are easily accommodated • Cross-functional teams • Vertical slice of functionality completed each sprint • Potentially shippable product after each sprint Deloitte Project 2 - Waterfall Waterfall is characterized by: • Fixed scope with estimated time and resources • All requirements detailed at beginning of project • Costly to incorporate changes • Potential for team siloes • Sequential work through each phase • One release at end of project Project 3 – Hybrid Agile Hybrid Agile is characterized by: • Fixed scope with estimated time and resources • High level requirements at the beginning of the project with prioritization and modifications throughout • Cross-functional teams during sprints • Sprints organized by features or prioritized processes • Releases throughout or at end of project Delivering Complex Programs with Consistency and Success 11 Phase One: Imperative The following describes how to support a client’s transformation journey Sustain Execute Integrate Operationalize Imperative PgM Journey Deloitte 1. Strategy and Transformation Imperative 2. Objectives, Guiding Principles & Stakeholder Management 3. Preliminary Set of Initiatives Description • Understand strategy and the transformation imperative facing the client • Establish the transformation objectives and guiding principles for decision making, and manage Stakeholders • Surface a preliminary set of transformation initiatives for analysis and prioritization • Establish structures for governance and management of the transformation program i. Governance Framework ii. Decision Rights Framework iii. Transformation Pipeline i. Implementation Plans • Develop detailed work plans and resource plans for the individual initiatives ii. Interdependency Alignment • Identify and align the dependencies between the initiatives iii. Integrated Transformation Roadmap • Develop an integrated implementation roadmap for the overall transformation program i. Delivery Assurance • Monitor and control all aspects of the transformation program and implementation progress ii. Program Health Checks • Regularly assess the program’s management processes to identify gaps and areas that require additional focus iii. Executive Reporting • Provide timely, actionable, and metrics-driven assessments of progress to key stakeholders i. Transition and Knowledge Transfer • Conduct transition and knowledge transfer to Business-As-Usual, and identify lessons learned for the program ii. Continuous Improvement iii. Program Closure • Define approach for identifying, escalating, making, and communicating key decisions • Analyze and rationalize initiatives and establish a pipeline of prioritized transformation initiatives • Develop approach and process for supporting and measuring continuous improvement • Resolve outstanding issues, archive program documents, and conduct client acceptance Delivering Complex Programs with Consistency and Success 12 Imperative Phase Outputs At the conclusion of the imperative phase, three principle outputs will have been developed that will be further utilized in the operationalize phase Outputs from Imperative Phase 1 Transformation Objectives Imperative Deloitte Operationalize 2 Guiding Principles and Anchoring Decisions Integrate 3 Initiative Concept Notes Execute Sustain Delivering Complex Programs with Consistency and Success 13 Phase Two: Operationalize The The following describes how to support a client’s transformation journey Sustain Execute Integrate Operationalize Imperative PgM Journey Deloitte 1. Strategy and Transformation Imperative 2. Objectives, Guiding Principles & Stakeholder Management 3. Preliminary Set of Initiatives Description • Understand strategy and the transformation imperative facing the client • Establish the transformation objectives and guiding principles for decision making, and manage Stakeholders • Surface a preliminary set of transformation initiatives for analysis and prioritization • Establish structures for governance and management of the transformation program i. Governance Framework ii. Decision Rights Framework iii. Transformation Pipeline i. Implementation Plans • Develop detailed work plans and resource plans for the individual initiatives ii. Interdependency Alignment • Identify and align the dependencies between the initiatives iii. Integrated Transformation Roadmap • Develop an integrated implementation roadmap for the overall transformation program i. Delivery Assurance • Monitor and control all aspects of the transformation program and implementation progress ii. Program Health Checks • Regularly assess the program’s management processes to identify gaps and areas that require additional focus iii. Executive Reporting • Provide timely, actionable, and metrics-driven assessments of progress to key stakeholders i. Transition and Knowledge Transfer • Conduct transition and knowledge transfer to Business-As-Usual, and identify lessons learned for the program ii. Continuous Improvement iii. Program Closure • Define approach for identifying, escalating, making, and communicating key decisions • Analyze and rationalize initiatives and establish a pipeline of prioritized transformation initiatives • Develop approach and process for supporting and measuring continuous improvement • Resolve outstanding issues, archive program documents, and conduct client acceptance Delivering Complex Programs with Consistency and Success 14 Transformation Program Governance and Management Structure While governance structures for transformation programs may vary based on the needs of the organization, effective governance structures align key functions, leadership, and execution. Sample Transformation Governance Structure Executive Steering Committee Functions:     Strategic direction and guidance Initiative prioritization and rationalization Alignment with business needs and functions Executive-level decision-making and issue resolution Business Engagement Functions: Program Sponsor Executive Steering Committee       Transformation Management Office Program Director Program Management Business Engagement Domain Authority  Stakeholder Management  Organizational Change Management  Training  Communications Domain Authority Functions: Program Operations Program Control Requirements Management Data Architecture Technical & Quality Standards Business Process Management Technical & Business Architecture Solution Planning Program Control Functions:      Risk Management Integrated Release Management Change Control Benefits & Performance Management Quality & Standards Program Operations Functions: Project Project Project Project Deloitte Program Level Budget Management Schedule Management Program Reporting Project Functions: Legend Transformation Strategy Level    Project Level    Project Execution and Delivery Project Risk and Issue Management Project Reporting Delivering Complex Programs with Consistency and Success 15 Understand the dependencies between Scope, Issues & Risks Issues, Risks and Changes impact each other, and they will impact Program resources and therefore timeline, scope and budget. Information Flow Risks May Create Scope or Change Requests Changes May Create Risks When a Risk Is Realized, It May Become an Issue Risk Management Issue Management Risks May Be Created From Issue Resolutions or From Issues That Are Left Unresolved Issues May Require Updates to the Resource Plans and IWP and vice versa Plan or Resource Changes May Create Risks Risks May Create Changes to Plans Issue Resolution May Impact Scope Changes May Create Issues Resource Management Integrated Workplanning Change Control Changes May Require Updates to the Resource Plans and IWP and vice versa Managing these processes carefully and understanding the dependencies minimizes (unpleasant) surprises for you and your client! Leverage the capabilities of your PgM tool* related to tracking and escalation. *A detailed overview of Deloitte’s recommended PgM tool can be found in the PgM toolkit chapter of this deck. Deloitte Delivering Complex Programs with Consistency and Success 16 Decision Rights Framework • Decision Rights are a key component of success for transformation programs and are about making business decisions. They are a framework by which business issues requiring formal decision making can be managed • These decisions can be triggered by internal (e.g., request for funding) or external events (e.g., change in regulations) and require a consistent set of information / analysis to support decision making • Decision Rights can be defined as: ˗ What decisions need to be made ˗ How to organize (committees/individuals) to make decisions ˗ What are the supporting management processes and tools to support decision making Components of a Decision Rights Framework: 1. Decision Inventory A list of the types of decisions that need to be made 2. Roles and Responsibilities Determine groups/individuals involvement in each decision based on a RACI (Responsible, Accountable, Consulted, Informed) model 3. Decision-Making Processes Documenting high level decision-making process to enable efficient execution of business processes across multiple functions 4. Decision Rights Model A hierarchy of decision-making groups owning the defined decisions. It facilitates interaction among key stakeholders involved in the decision making process An effective decision-making process can be managed by utilizing a Decision Rights Framework so that all participants understand and adhere to their roles, responsibilities, and authority. Deloitte Delivering Complex Programs with Consistency and Success 17 Develop Transformation Pipeline Using high-level estimates from the initiative prioritization exercise, draft transformation pipeline of initiatives as a starting point for the development of the robust transformation roadmap. The pipeline indicates which set of initiatives should be executed in the short, medium, and long-terms. Ranked Queue 1. Initiative C Higher Wave II Wave III Wave I 3. Initiative E 4. Initiative B Wave I Wave II 5. .... Budget / Resource cap Difficulty to Achieve 2. Initiative A Transformation Pipeline m..... n. Initiative X o. Initiative Y p. Initiative Z .... Time (0-30 months) Lower Wave III Finance Technology Human Resources Real Estate Risk Operations Legal and Compliance Comms and Branding Cross Functional Note: Size of bubble represents relative size of opportunity for each Function Deloitte Illustrative Delivering Complex Programs with Consistency and Success 18 Operationalize Phase - Outputs In the Integrate phase, these major outputs will be synthesized along with other tools into a robust Transformation Roadmap Outputs from Operationalize Phase 1 Governance Structure Imperative Deloitte Operationalize 2 Change Management Plan Integrate 3 Execute Initial Pipeline Plan Sustain Delivering Complex Programs with Consistency and Success 19 Phase Two: Operationalize The The following describes how to support a client’s transformation journey Sustain Execute Integrate Operationalize Imperative PgM Journey Deloitte 1. Strategy and Transformation Imperative 2. Objectives, Guiding Principles & Stakeholder Management 3. Preliminary Set of Initiatives Description • Understand strategy and the transformation imperative facing the client • Establish the transformation objectives and guiding principles for decision making, and manage Stakeholders • Surface a preliminary set of transformation initiatives for analysis and prioritization • Establish structures for governance and management of the transformation program i. Governance Framework ii. Decision Rights Framework iii. Transformation Pipeline i. Implementation Plans • Develop detailed work plans and resource plans for the individual initiatives ii. Interdependency Alignment • Identify and align the dependencies between the initiatives iii. Integrated Transformation Roadmap • Develop an integrated implementation roadmap for the overall transformation program i. Delivery Assurance • Monitor and control all aspects of the transformation program and implementation progress ii. Program Health Checks • Regularly assess the program’s management processes to identify gaps and areas that require additional focus iii. Executive Reporting • Provide timely, actionable, and metrics-driven assessments of progress to key stakeholders i. Transition and Knowledge Transfer • Conduct transition and knowledge transfer to Business-As-Usual, and identify lessons learned for the program ii. Continuous Improvement iii. Program Closure • Define approach for identifying, escalating, making, and communicating key decisions • Analyze and rationalize initiatives and establish a pipeline of prioritized transformation initiatives • Develop approach and process for supporting and measuring continuous improvement • Resolve outstanding issues, archive program documents, and conduct client acceptance Delivering Complex Programs with Consistency and Success 20 Detailed planning aligns stakeholders and ensures success Effective planning maps out tasks of projects in the program, timing, roles, and responsibilities. Project schedules are a key tool to ensuring stakeholders understand their responsibilities and expectations and that the program has appropriate insight into activities and resources necessary to complete the project scope. Initial Pipeline Plan Begin developing project schedules using output from Phase 2’s “Initial Pipeline Plan” Milestones Standard Project Schedule Fields Name Name of team / project element Milestone % Complete Estimated % complete of project element Requirements Duration Duration of project element Start Project element start date  R1 - Objectives Approved  R2 - Requirements Elicited & Documented  P1 - High Priority Process Artifacts Completed Process Finish Project element finish date Predecessor Dependency element # within work plan Planned project deliverable for each Deliverable element External Dependencies external to project work plan Dependency Estimate Key assumptions / rationale for element Assumptions durations Resource Names Resource ownership of project elements  P2 - Medium Priority Process Artifacts Completed  P3 - Low Priority Process Artifacts Completed  D1 - Design Complete  B1 - Build Complete Project Rollout  IR1 - Implementation Readiness Complete  DP1 - Deployment Complete  C1 - Project Close Project Schedule Deloitte  Programs typically use PMC and MS Project to build and manage project schedules  Schedules are then uploaded into HP PPM PgM for ongoing management at the Program Level Delivering Complex Programs with Consistency and Success 21 Implementation Plans – Reporting High-level program reporting across project milestones is imperative to successfully track and understand progress. Individual Project Schedules Project A Each project builds a detailed bottoms-up workplan Individual Workstream-Level Reports Projects from the same workstream are consolidated into a standardized reporting template, which provides:  Quick, simple view of the overall workstream progress and schedule  Ability to track completed, early and late milestones in a program-wide forum on a weekly basis ILLUSTRATIVE Workstream A 2009 Workstream B SEPT IMO R2 – Requirements Elicited and Documented Today’s Date Current date for status tracking reference 100% OCT 2010 NOV 2009 SEPT (3 of 3) OCT DEC NOV JAN DEC FEB JAN MAR FEB APR MAR MAY 2010 JUN APR MAY JUL JUN AUG JUL SEPT AUG SEPT IMO R2 – Requirements Elicited 100% (3 of 3) IMO R3 and – Business Requirement Documented 100% (3 of 3) Approvals Completed IMO R3 – Business Requirement IMO R4 Approvals – System Requirement Completed Approvals Completed 100% 0% IMO R4 – System Requirement IMO P1-3 - ProcessCompleted Artifacts Approvals 100% Completed IMO P1-3 - Process Artifacts IMO D1 Completed - Design Complete 0% (0 of 3) (3 of 3) 100% IMO D1 - Design Complete IMO B1 - Build Complete Project B (3 of 3) (0 of 3) B1 - Build System Complete IMO T1 IMO - Independent Testing Complete IMO T1 - Independent System IMO IR1Testing - Implementation Complete Readiness Complete (3 of 3) 0% (0 of 3) 0% (0 of 3) (0 of 3) 0% (0 of 3) (0 of 3) 0% 0% 0% (0 of 3) 0% IMO IR1 - Implementation Readiness Complete IMO DP1 - Deployment Complete (0 of 3) 0% (0 of 3) 0% (0 of 3) IMO DP1 - Deployment Complete IMO TR1 - Training Complete Milestone End Date IMO TR1 - Training Complete Planned final completion date across milestone category NOT APPLICABLE Milestone Quantity Information NOT APPLICABLE Number of milestones complete out of the total across the workstream 0% (0 of 3) Progress Bar % complete of the specific milestone category Note: A Milestone is defined as a significant event or time period within the life cycle of the project. These typically are used for progress reporting or linking to external dependencies. Milestones are usually zero effort, zero duration tasks that have predecessor/successor links or constraints and no resource assignments Deloitte Delivering Complex Programs with Consistency and Success 22 Implementation Plans – Planning Project Resources Allocating and managing against a resource plan ensures projects stay within budget and meet defined milestone dates Snapshot of Resource Planning Grid ILLUSTRATIVE Program Name Day 1 – Paper Project Name XXX External Resource Resource PM Start - Hourly Type Name Comments Date Rate End Total Total Rate Date Hours Cost XXX 9/30 XXX John Smith Secured availability 5/16 XXX XXX XXX Column Descriptions Program Name Project Name Resource Type Other External Rate Resource Name PM Comments Start Date End Date Total Hours Date Deloitte Resource Management Highlights  Project personnel needs with detailed resource estimates to ensure adequate staff levels  Forecast resource capacities and allow the Program Management team to proactively guide and assist project teams when needed  Enable Project Managers to track which roles have been filled and time periods which may be lacking resource coverage during execution Descriptive Program Name where applicable Descriptive Project name Select descriptive title for the resource Resource type differs from identified list Rate used for external resources – contractors and consultants Resource’s name Comments from the project manager / lead Start of resource duration End of resource duration Calculated value of weekly hours Count of resource’s hours for the week ending on that date ; 1 full-time employee (FTE) is equivalent to 40 hr Delivering Complex Programs with Consistency and Success 23 Aligning Interdependencies Identifying, managing, and aligning critical path project dependencies is key to minimizing the effect of slippages and mitigating the risk of overall delays. Key Steps 1 Identify program-level milestones and dependencies with “Walk the Walls” workshop 3 Deloitte 2 Map identified interdependencies and points requiring coordination using Dependency Planner Prioritize risk and plan mitigation strategies using Risk Management Framework Delivering Complex Programs with Consistency and Success 24 "Walk the Walls" – Workshop Overview “Walk the Walls” is a planning alignment exercise that enables the rapid identification of cross-team deliverables and dependencies throughout the program, and the building of an integrated milestone roadmap to govern the program going forward. Tools Inputs Transformation Pipeline Key Activities  Workstreams develop “Milestone cards” by identifying their respective: − Program-wide deliverables − Critical path milestones − Cross-program interdependencies  Review and ensure alignment on program-wide path to achieve transformation (milestones, dates, dependencies) Develop mutual understanding of interdependencies across teams Identify additional gaps, risks and issues, open questions, and open interdependencies Detailed Workplans Objectives “Walk the Walls” Workshop   Dependency Planner Outputs Risk Management Framework   Document initiative interdependencies and establish points for coordination Perform decision risk analysis to identify planning risks, determine degree of risk, and develop risk mitigation plans Note: Walk the Walls is often used in M&A engagements. For more information, refer to the M&A Square 1 site for supporting tools and methods. Deloitte Delivering Complex Programs with Consistency and Success 25 "Walk the Walls" – Milestone Alignment Activity During “Walk the Walls,” teams ensure that relevant milestones have been identified, milestone owners assigned, alignment on milestone timing obtained, and dependencies highlighted  Prep Present Discuss Review Each team pre-populates index cards identifying their project’s critical path milestones and interdependencies  Color-code dependencies based on type (e.g., dependency on IT, go-live date, etc.) and/or priority  Post milestone cards to the “Wall”  Teams do preliminary “Walk the Walls” to obtain an initial understanding of how the program’s deliverables relate  Present inbound / outbound dependencies and timing for each deliverable, spending more time on critical path deliverables  Identify risks or issues that might impact deliverables  Make note of any misaligned end dates, missing milestones / dependencies, project scope overlaps, additional resourcing needs etc.  Detailed “Walk the Walls” with in-depth discussions if adjustments to milestones, dates, dependencies, resourcing, and/or scope are needed  Identify and define interdependencies; ensure that teams are aligned on dependency needs and timing  Raise any concerns that should be recorded in the “parking lot” Format Function Name & # Dependency Milestone Description Begin Date End Date Example Finance P017 Day 1 Critica l SWDNA Decommission ASU Daily Feed May 25, 2012 Day 2 At the end of the session, the group will:  Review the revised wall to ensure that the new timeline is accurate  Work through any issues captured in the “parking lot”  Document all identified interdependencies Note: Walk the Walls is often used in M&A engagements. For more information, refer to the M&A Square 1 site for supporting tools and methods. Deloitte Delivering Complex Programs with Consistency and Success 26 High-Level Initiative Roadmap – Example The high-level roadmap displays the major initiatives identified to transition the client’s future state: 2013 Jan Q4 Key business milestones Core systems capabilities Q1 Insurance sales Dec Q2 Claims 2014 Jan Q3 Q4 Claims (Harvest) Q1 Insurance sales AgriStability fee deadline Q2 Claims Farm loans sales Dec 2015 Jan Q3 Q4 Claims (Harvest) Crop HPR deadlin e AgriStability supplementary fee deadline AgriStability fee deadline Q1 Insurance sales Farm loans sales Supp/tax info deadline ILLUSTRATIVE Dec Q2 Claims 2016 Q4 Q3 Claims (Harvest) Farm loans sales Supp/tax info deadline Crop HPR deadline AgriStability fee deadline Supp/tax info deadline Crop HPR deadline Systems operations and maintenance Oracle DB & PB upgrade High availability data centre implementation with disaster recovery Core systems fit-gap analysis Core systems transition strategy Competency classification solution Finance updates Job descr. & classifications Organization structure Future state processes, policies, and procedures Future state processes defined Organization transition Program | product changes implemented Ongoing program | product updates Knowledge Employee portal Management (KM) upgrade KM strategy KM tools and defined processes in place Program | product updates Culture def. Legend Policies, procedures & systems | workflows updated and strategy Culture Future-state culture defined strategy defined Organization training and transition Initiate corporate training plan Performance management system upgrade Dependencies System initiative Milestone Future initiative (to be defined) Non-transformation (operational) Support staff in new roles New org. structure in place Client interaction model Single view of the customer Master data mgmt. (MDM) Data clean-up MDM standards Customer complete and system in segmentation place Customer Relationship Management (CRM) CRM discovery complete Foundational initiative Phase 1: Transition Ready Deloitte Benefits delivered in Phase 2 (2013/14): • Defined org. structure, RACI, job descr. • Program | product changes implemented • Customer segmentation strategy complete • MDM implemented • Channel strategy complete CRM implemented Benefits delivered in Phase 3 Phase 2: (2014/15): Transformation • New policies and procedures defined Initiatives • Staff trained and systems updated to support new org. structure • New org. structure fully transitioned • CRM implemented • Portal content migrated to new platform Phase 3: Optimization Initiatives Benefits delivered in Phase 4 (2015/16): • Portal enhancements (TBD) Delivering Complex Programs with Consistency and Success Phase 4: Final 27 Business Transformation Methodology The following is a generic methodology that contains most of the common activities found in business transformation projects Components of Business Transformation 1. Change Management 1. Project Administration 2. Leadership & Stakeholder Alignment 2. Project Organization 3. Communications 3. Risk, Issue, Decision Management 4. Learning & Capability Transfer PMO 5. Org. Design & Workforce Transition 4. Project Reporting 5. Project Finance 6. Deployment Readiness Business / CompanyCustomer Vision 1. Strategy Design Strategy 1. Architecture 2. Environment Management 3. Data Conversion 4. Management Information 5. Applications 6. Infrastructure Deloitte Technology 1. Operating Model 2. Process Design 3. Facilities 4. Real Estate Delivering Complex Programs with Consistency and Success 28 De la Gestión de Proyectos a la Gestión de Procesos Un Enfoque de Trabajo Miguel E. Hidalgo G. Senior Manager - Operational Excellence [email protected] Deloitte Delivering Complex Programs with Consistency and Success 29 Se debe lograr una transición que genere el menor impacto y facilite la operación conforme a lo esperado 1 2 3 Deloitte Diseñar el modelo operacional futuro, vinculando la estrategia con objetivos tácticos Asegurar que los procesos futuros (To Be): • Se alineen con la transformación • Maximicen la eficiencia • Mejoren la calidad del servicio/producto Asegurar el Soporte e Instalaciones para la nueva estructura estructura organizacional. Delivering Complex Programs with Consistency and Success 30 Un enfoque integral Deloitte Delivering Complex Programs with Consistency and Success 31 Un enfoque metodológico que permite la optimización y mejora de procesos, logrando alinearlos a los atributos del cliente y estrategia de la organización Definir Oportunidades Objetivo: Identificar el problema, alcance del proyecto y establecer metas de mejora. Medir Rendimiento Valores Fundamentales Controlar Rendimiento Objetivo: Monitorear y mejora continua. Personas Excepcionales Mejoramiento de Negocio Objetivo Común Ejecución de Excelencia Alta Colaboración Implementar Objetivo: Desarrollar soluciones para enfrentar las causas. Deloitte Objetivo: Medir el estado actual del rendimiento del proceso e identificar oportunidades. Analizar Oportunidades Objetivo: Identificar las causas y evaluar potenciales soluciones. Delivering Complex Programs with Consistency and Success 32 Integrando… Diseñar el modelo operacional futuro, vinculando la estrategia con objetivos tácticos Asegurar que los procesos futuros (To Be) se alineen con la transformación, maximicen la eficiencia, y mejoren la calidad del servicio/producto Asegurar el Soporte e Instalaciones para la nueva estructura estructura organizacional. Definir Deloitte Medir Analizar Implementar Controlar Delivering Complex Programs with Consistency and Success 33 En la fase “Definir” se revisa el estado actual, objetivos y planificación del proyecto Definir Medir Analizar Implementar Controlar En la primera fase del proyecto se destina a evaluar el estado actual de la organización y planificar todas las actividades claves, plazos y productos. Actividades Claves • Establecer Modelo Operativo de Alto Nivel. • Identificar la capacidad de gestionar procesos (Madurez). • Determinar brechas y Plan de Implementación. Herramientas Deloitte Delivering Complex Programs with Consistency and Success 34 En la etapa de “Medir” se analizan los atributos del cliente y se realiza un análisis de los procesos Definir Medir Analizar Implementar Controlar Realizar análisis del desempeño actual de los procesos, identificar productos/servicios estratégicos, y los atributos que valora el cliente. Actividades Claves • Definir alcance y Plan de Implementación. • Realizar análisis “Voice of the Customer” (VOC). • Levantar procesos As Is y su evaluación (desempeño, KPIs). • Identificar requisitos para el soporte e infraestructura. • Redefinir Modelo Operativo. Herramientas D Develop New Products/Services S Sell Products and Services Cont'd. S-010 Analyze the Sales Area S-110 Build and Maintain Relationship with Customer and Intermediary S-170 Initiate, Manage and Close Internet Sale K-160 Develop Physical Distribution Channel Strategy S-060 Develop Sales Plan S-120 Identify Specific Sales Opportunities for Direct Sales S-180 Provide Sales Support K-170 Manage Product Obsolescence S-070 Determine Customer Contact Team S-130 Initiate, Manage and Close Direct Sale S-190 Manage and Evaluate Performance K-040 Define Categories K-110 Design and Develop Pricing Strategy K-180 Develop Sales Force Strategy S-080 Determine Call Center Infrastructure S-140 Initiate and Manage Proposal S-200 Develop Operating Plan K-050 Identify Customer or Market Segments K-130 Design and Develop Promotion Strategy K-190 Design and Develop Customer Service Strategy S-090 Design and Develop Applications/ Infrastructure for Internet Sales S-150 Initiate, Manage and Close Contracts S-210 Close the Loop to Marketing, Planning, Manufacturing, and Logistics K-060 Perform Internal Assessment K-140 Design and Develop Advertising Strategy K-200 Develop Product/ Service Forecast S-100 Select/Manage Resellers, Sales Agents, Brokers, Distributors S-160 Initiate, Manage and Close Telemarketing Sale D-220 Implement Products/Services K-010 Plan and Conduct Research K-070 Identify Marketing Opportunities K-150 Develop Public Relations Strategy D-170 Define Marketing and Sales Plan (Customer Requirements) D-230 Qualify Products/ Services K-020 Conduct Market Analysis K-090 Develop Product Life Cycle and Global Strategies D-180 Conduct Research and Development D-240 Manage Change Orders K-030 Conduct Competitor Analysis K-100 Develop Positioning for Products and Services D-190 Develop and Design Products D-250 Manage Alpha/ Beta Product Releases D-200 Develop and Design Services D-260 Launch Products/ Services D-210 Develop and Design Processes Deloitte K Market Products and Services D-160 Plan and Manage Product Business Plans K-210 Implement/Control the Marketing Plan Infrastructure Processes Delivering Complex Programs with Consistency and Success 35 En la etapa de “Analizar” se recopila y analiza la información obtenida Definir Medir Analizar Implementar Controlar En esta etapa se analiza la información obtenida y se define un roadmap para la implementación óptima de cada uno de los procesos. Actividades Claves • Benchmarking del Modelo Operativo y/o comparación con el modelo actual. • Realizar Benchmark donde se identifiquen las mejores prácticas y KPI’s de la industria. • Realizar análisis causa-efecto. Simulaciones. Casos de Prueba. • Identificar oportunidades y definir roadmap de implementación. • Generar presupuestos para infraestructura y nuevos miembros del equipo. Herramientas Deloitte Delivering Complex Programs with Consistency and Success 36 En la etapa de “Implementar” se incorporan las mejores prácticas de la industria y comienzan a rodar los nuevos procesos Definir Medir Analizar Implementar Controlar Una vez que se tienen las oportunidades de mejora identificadas y validadas, se comienza a trabajar en el “vamos”. Actividades Claves • Diseñar procesos To Be, con todos sus elementos. • Implementación de los nuevos procesos. • Implementar la nueva infraestructura e incorporación de nuevos miembros del equipo. • Generar las competencias del equipo. Herramientas D Develop New Products/Services K Market Products and Services S-170 Initiate, Manage and Close Internet Sale K-160 Develop Physical Distribution Channel Strategy S-060 Develop Sales Plan S-120 Identify Specific Sales Opportunities for Direct Sales S-180 Provide Sales Support K-170 Manage Product Obsolescence S-070 Determine Customer Contact Team S-130 Initiate, Manage and Close Direct Sale S-190 Manage and Evaluate Performance K-110 Design and Develop Pricing Strategy K-180 Develop Sales Force Strategy S-080 Determine Call Center Infrastructure S-140 Initiate and Manage Proposal S-200 Develop Operating Plan K-050 Identify Customer or Market Segments K-130 Design and Develop Promotion Strategy K-190 Design and Develop Customer Service Strategy S-090 Design and Develop Applications/ Infrastructure for Internet Sales S-150 Initiate, Manage and Close Contracts S-210 Close the Loop to Marketing, Planning, Manufacturing, and Logistics K-060 Perform Internal Assessment K-140 Design and Develop Advertising Strategy K-200 Develop Product/ Service Forecast S-100 Select/Manage Resellers, Sales Agents, Brokers, Distributors S-160 Initiate, Manage and Close Telemarketing Sale K-010 Plan and Conduct Research K-070 Identify Marketing Opportunities K-150 Develop Public Relations Strategy D-170 Define Marketing and Sales Plan (Customer Requirements) D-230 Qualify Products/ Services K-020 Conduct Market Analysis K-090 Develop Product Life Cycle and Global Strategies D-180 Conduct Research and Development D-240 Manage Change Orders K-030 Conduct Competitor Analysis K-100 Develop Positioning for Products and Services D-190 Develop and Design Products D-250 Manage Alpha/ Beta Product Releases K-040 Define Categories D-200 Develop and Design Services D-260 Launch Products/ Services Deloitte Cont'd. S-110 Build and Maintain Relationship with Customer and Intermediary D-220 Implement Products/Services D-210 Develop and Design Processes S Sell Products and Services S-010 Analyze the Sales Area D-160 Plan and Manage Product Business Plans K-210 Implement/Control the Marketing Plan Infrastructure Processes Delivering Complex Programs with Consistency and Success 37 En la etapa de “Controlar” se monitorean diseñan los tableros de control y se realizan revisiones a los procesos Definir Medir Analizar Implementar Controlar En esta etapa se monitorean los procesos y su desempeño, de acuerdo a lo planificado, retroalimentándolos. Actividades Claves • Diseñar el tablero de control de los KPIs. • Monitorear los KPIs y establecer la eficiencia de los procesos. • Levantar alertas en caso de ser necesario. • Realizar análisis causa-efecto para los procesos con bajo desempeño. Herramientas Deloitte Delivering Complex Programs with Consistency and Success 38 Integrate Phase Outputs At the conclusion of the integrate phase, three principle outputs will have been developed that will be further utilized in the Execute phase Outputs from Integrate Phase 1 Implementation Plans Imperative Deloitte Operationalize 2 Interdependency Alignment Integrate 3 Transformation Roadmap Execute Sustain Delivering Complex Programs with Consistency and Success 39 Phase Four: Execute The following describes how to support a client’s transformation journey Sustain Execute Integrate Operationalize Imperative PgM Journey Deloitte 1. Strategy and Transformation Imperative 2. Objectives, Guiding Principles & Stakeholder Management 3. Preliminary Set of Initiatives Description • Understand strategy and the transformation imperative facing the client • Establish the transformation objectives and guiding principles for decision making, and manage Stakeholders • Surface a preliminary set of transformation initiatives for analysis and prioritization • Establish structures for governance and management of the transformation program i. Governance Framework ii. Decision Rights Framework iii. Transformation Pipeline i. Implementation Plans • Develop detailed work plans and resource plans for the individual initiatives ii. Interdependency Alignment • Identify and align the dependencies between the initiatives iii. Integrated Transformation Roadmap • Develop an integrated implementation roadmap for the overall transformation program i. Delivery Assurance • Monitor and control all aspects of the transformation program and implementation progress ii. Program Health Checks • Regularly assess the program’s management processes to identify gaps and areas that require additional focus iii. Executive Reporting • Provide timely, actionable, and metrics-driven assessments of progress to key stakeholders i. Transition and Knowledge Transfer • Conduct transition and knowledge transfer to Business-As-Usual, and identify lessons learned for the program ii. Continuous Improvement iii. Program Closure • Define approach for identifying, escalating, making, and communicating key decisions • Analyze and rationalize initiatives and establish a pipeline of prioritized transformation initiatives • Develop approach and process for supporting and measuring continuous improvement • Resolve outstanding issues, archive program documents, and conduct client acceptance Delivering Complex Programs with Consistency and Success 40 Execute Phase Outputs At the conclusion of the integrate phase, three principle outputs will have been developed that will be further utilized in the Execute phase Outputs from Execute Phase 1 Monthly Health Check Scorecard Imperative Deloitte Operationalize 2 Integration Success Metrics Integrate Execute 3 Status Reports Sustain Delivering Complex Programs with Consistency and Success 41 Phase Four: Execute The following describes how to support a client’s transformation journey Sustain Execute Integrate Operationalize Imperative PgM Journey Deloitte 1. Strategy and Transformation Imperative 2. Objectives, Guiding Principles & Stakeholder Management 3. Preliminary Set of Initiatives Description • Understand strategy and the transformation imperative facing the client • Establish the transformation objectives and guiding principles for decision making, and manage Stakeholders • Surface a preliminary set of transformation initiatives for analysis and prioritization • Establish structures for governance and management of the transformation program i. Governance Framework ii. Decision Rights Framework iii. Transformation Pipeline i. Implementation Plans • Develop detailed work plans and resource plans for the individual initiatives ii. Interdependency Alignment • Identify and align the dependencies between the initiatives iii. Integrated Transformation Roadmap • Develop an integrated implementation roadmap for the overall transformation program i. Delivery Assurance • Monitor and control all aspects of the transformation program and implementation progress ii. Program Health Checks • Regularly assess the program’s management processes to identify gaps and areas that require additional focus iii. Executive Reporting • Provide timely, actionable, and metrics-driven assessments of progress to key stakeholders i. Transition and Knowledge Transfer • Conduct transition and knowledge transfer to Business-As-Usual, and identify lessons learned for the program ii. Continuous Improvement iii. Program Closure • Define approach for identifying, escalating, making, and communicating key decisions • Analyze and rationalize initiatives and establish a pipeline of prioritized transformation initiatives • Develop approach and process for supporting and measuring continuous improvement • Resolve outstanding issues, archive program documents, and conduct client acceptance Delivering Complex Programs with Consistency and Success 42 Knowledge Transfer Framework Separate from training for end-users, “Knowledge Transfer” is an integral part of the change process. It is the collaborative process of building explicit knowledge, skills, and abilities (along with the confidence to apply them) through activities, mentoring, and other project activities. Knowledge Transfer Framework Change Readiness Assessment Communications Change Risk Wheel The Change Risk Diagnostic provides a structured approach which can be used to rapidly identify the critical project risks that need to be addressed in the Change Management Plan Competing Initiatives What other projects and initiatives will impact the transformation? Vision Proposition How strong is the business case? Organization/Infrastructure How will our culture and organizational infrastructure support the project? Vision Focus How clear is the vision? Migration Plan How clearly defined are the steps to achieving the future state? Stakeholder Resistance How much resistance exists? Technical/Training How skilled are individuals in the Technology and organization aspect of transformation? Area Ready for Change Executives Sponsorship How much support truly exists? Area of Potential Concern Management Distribute communications to ensure that employees are well-informed about and involved in the change Significant Obstacles to Change Employees Project Team AMTRAK_104_02 Revise opportunities and barriers identified that must be addressed for the project to be implemented successfully Materials: Change Management Communication Strategy, Phase 1 Materials: Change Readiness Assessment, Phase 1 Knowledge Transfer Stakeholder Analysis Identify and involve stakeholders with authority, power, and influence to lead and visibly support the knowledge transfer Materials: Stakeholder Analysis, Phase 1 Deloitte Training Develop materials and conduct trainings to ensure employees are provided skills to use the new processes and systems to their work Delivering Complex Programs with Consistency and Success 43 Continuous Improvement – Overview Continuous Improvement maximizes the organization’s ability to efficiently execute business processes in a way that is aligned with strategic goals, while ensuring improvements are institutionalized and engrained in the fabric of the organization. Components of Continuous Improvement WHAT WHY WHO Disciplined approach to continually identify and evaluate opportunities for service optimization Institutionalize an approach to track realization of benefits and maintain value realization after program close. Business as usual, steering committee, governance body, and knowledge transfer teams involved. Identify key metrics that the program will focus on to drive Continuous Improvements to the business Analyze causal hypotheses, identify root causes, validate hypothesis Improve by developing ideas to address root causes, test solutions, execute improvement solutions/measure results Control and maintain performance by establishing standard measures to enable continuous improvement, communicate results Deloitte Sustain transformation objectives by establishing a repeatable framework to identify, implement, and measure service improvement Measure targeted KPIs, identify surface level opportunities or symptoms, baseline operational processes Track, monitor, and sustain benefit / value realization resulting from transformation Organizational Leadership sets strategic direction used to drive the Continuous Improvement program Business stakeholders who focus on business value and business-facing improvements Execution teams focused on ensuring successful transformation (i.e., Program, Continuous Improvement teams) Delivering Complex Programs with Consistency and Success 44 Formal Program Closure All projects and programs have a finite start and end. Closing projects involves gaining stakeholder and customer acceptance of the final products and services, and bringing the program to an orderly end. Closing Process Processes performed to conclude all activities across the program to formally complete the program, projects, or phase. Close Program, Projects, or Phase Close Procurement Process Focus on final product, service or result transition, and updating of organizational process assets Focus on formal closing of contract, procurement artifacts, and procurementrelated lessons learned. • • Administrative Closure: Release project resources, return assets, pack up daily operations, etc. Handover: Conduct review meeting, train handover stakeholders − Capture and handover all project artifacts and formal documentation on completion/termination of project/phase • End of Project Learning: Update organization process assets, document lessons learned • After Action Review Evaluate • Contract Closure: Formal closeout of all contracts, review of deliverables, conduct project deliverable acceptance What did we set out to do? • What did we achieve? − Verify project scope and review terms and conditions • What went really well? • What could have gone better? • What prevented us from doing more? • What can we learn from this? − Update organizational activities − Receive formal written notice that contract is completed It is important to formally close the program in order to reflect on what can be learned to improve future transformations. Deloitte Delivering Complex Programs with Consistency and Success 45 Rosario Norte 407 Las Condes, Santiago Chile Phone: (56) 227 297 000 Fax: (56) 223 749 177 [email protected] Simón Bolívar 202 Office 203 Iquique Chile Phone: (56) 572 546 591 Fax: (56) 572 546 595 [email protected] Av. Grecia 860 3rd floor Antofagasta Chile Phone: (56) 552 449 660 Fax: (56) 552 449 662 [email protected] Los Carrera 831 Office 501 Copiapó Chile Phone: (56) 522 524 991 Fax: (56) 522 524 995 [email protected] www.deloitte.cl Deloitte provides audit, tax, consulting, and financial advisory services to public and private clients spanning multiple industries. With a globally connected network of member firms, Deloitte brings world-class capabilities and deep local expertise to help clients succeed wherever they operate. Deloitte’s approximately 200,000 professionals are committed to becoming the standard of excellence. This publication contains general information only, and none of Deloitte Touche Tohmatsu Limited, any of its member firms or any of the foregoing’s affiliates (collectively the “Deloitte Network”) are, by means of this publication, rendering accounting, business, financial, investment, legal, tax, or other professional advice or services. This publication is not a substitute for such professional advice or services, nor should it be used as a basis for any decision or action that may affect your finances or your business. Before making any decision or taking any action that may affect your finances or your business, you should consult a qualified professional adviser. No entity in the Deloitte Network shall be responsible for any loss whatsoever sustained by any person who relies on this publication. Deloitte © refers to one or more of Deloitte Touche Tohmatsu Limited, a UK private company limited by guarantee, and its network of member firms, each of which is a legally separate and independent entity. Please see www2.deloitte.com/about for a detailed description of the legal structure of Deloitte Touche Tohmatsu Limited and its member firms. Deloitte Touche Tohmatsu Limited is a private company limited by guarantee incorporated in England & Wales under company number 07271800, and its registered office is Hill House, 1 Little New Street, London, EC4A 3TR, United Kingdom. © 2017 Deloitte. All rights reserved. Alvares 646 Office 906 Viña del Mar Chile Phone: (56) 322 882 026 Fax: (56) 322 975 625 [email protected] Chacabuco 485 7th floor Concepción Chile Phone: (56) 412 914 055 Fax: (56) 412 914 066 [email protected] Quillota 175 Office 1107 Puerto Montt Chile Phone: (56) 652 268 600 Fax: (56) 652 288 600 [email protected]