Preview only show first 10 pages with watermark. For full document please download

Torkstar Screen Mounting Instructions

   EMBED


Share

Transcript

Installation Instructions Attaching Paragon to TorkStar Utility Line Set by Draper Caution ➀ Hoist screen for attachment using the eyebolts in the hanging brackets on each end of the screen. DO NOT lift case by the center, picking the case up at other points will damage the case. ➁ Screen must be installed so it is hanging level. Use a level to doublecheck. ➂ For wiring diagram (if required), see the instruction sheet for this model of screen. ➃ Make sure all connections are secure before hoisting the screen. ➄ Key switch to be in full view of unit during operation. ➅ If projection screen attachment points do not match up with the drop cables from the spools, an intermediate batten can be used. Attach the batten to the TorkStar drop cables, then attach the projection screen to the batten. ➆ These instructions may be used only for installing the Draper Paragon screen. This kit is not designed for use with any other projection screen manufactured by Draper or with any screen from another manufacturer. ➇ If using a Projection Screen Batten (see page 2) batten MUST be 2.5" O.D. by minimum of 13 gauge. Electrical Cable Attachment Detail Nipple Strain Relief Coupling 90° connector Nipple These instructions are meant as a guide only. They do not bind Draper, Inc. in any way and do not imply any responsibility of Draper, Inc. for improper installation or faulty workmanship at the job site. Direct Mounting to Paragon Screen Case A C B D A Section A-A Thimble Live end main drop cables 1 Clip base width Main cables from TorkStar Dead end safety cables 1 Clip base width Dead end main drop cables 2 4" Turnback Safety cable 2 Crosby fist grip clip (2) per main drop cable Thimble Jaw threaded pin both ends of turnbuckle 2 Alternate tightening of nuts for each fist grip clip to 30 Ft.-lbs Detail B Saddles on top 2 clips go over main cables from TorkStar Alternate tightening of nuts for each clip to 7.5 Ft.-lbs. Safety cables from screen Turnbuckle jaw Turnbuckle jaw and body moused with heavy gauge wire after leveling (provided by installer) Turnbuckle body Saddles on bottom 2 clips go over safety cables Detail C ® Pin nut tightened against jaws Jam nut tightened against turnbuckle body after screen leveling Bottom fist grip clip from main drop cable Jam nut tightened against turnbuckle body after screen leveling Pin nut tightened against jaws Jaw threaded pin both ends of turnbuckle Eyebolt, washer and locknut Turnbuckle jaw and body moused with heavy gauge wire after leveling (provided by installer) Turnbuckle jaw Detail D Copyright © 2012 Draper Inc. Form TorkStar_Paragon_Inst12 Printed in U.S.A. If you encounter any difficulties installing or servicing your TorkStar or screen, call your dealer or Draper Inc., Spiceland, Indiana, (765) 987-7999 or fax (765) 987-7142. Attaching Paragon to TorkStar Utility Line Set by Draper page 2 of 2 Mounting to Batten then to Paragon Screen Case Live end main drop cables 1 Clip base width Dead end main drop cables C 4" Turnback Safety cable B Crosby fist grip clip (2) per main drop cable Thimble Alternate tightening of nuts for each fist grip clip to 30 Ft.-lbs D A Detail B Main cables from TorkStar Dead end safety cables 1 Clip base width Saddles on top 2 clips go over main cables from TorkStar 2 Alternate tightening of nuts for each clip to 7.5 Ft.-lbs. 2 Section A-A Saddles on bottom 2 clips go over safety cables 2 A Electrical Cable Attachment Detail Safety cables from screen Detail C Thimble Jaw threaded pin both ends of turnbuckle Nipple Strain Relief Pin nut tightened against jaws Jam nut tightened against turnbuckle body after screen leveling 90° connector Coupling Nipple Bottom fist grip clip from main drop cable Turnbuckle jaw Turnbuckle jaw and body moused with heavy gauge wire after leveling (provided by installer) Turnbuckle body Projection Screen Batten Splice Kit For screens requiring a Projection Screen Batten longer than 20', a splice kit is required. ➀ Slide pre-drilled batten tubes over the splice tube. ➁ Line up the holes in the splice tube with the holes in the batten tubes. ➂ Secure using ½"-13 x 3" zine hex head cap screws and ½"-13 nylon lock nuts. ➃ Attach to drop cables as shown above. Please Note: Be sure that the center drop cable and clamp are centered on the meeting point of the two sections of projection screen batten. The clamp should cover the the meeting point of the two sections. 1 Batten Pipe A Splice Pipe 4 Section AA 10" 18" 3" 1 3 2 36" Varies Varies www.draperinc.com (765) 987-7999 Jam nut tightened against turnbuckle body after screen leveling Pin nut tightened against jaws Jaw threaded pin both ends of turnbuckle Eyebolt, washer and locknut Turnbuckle jaw and body moused with heavy gauge wire after leveling (provided by installer) Turnbuckle jaw Detail D ➀ TorkStar Splice Tube 2½" O.D. x 13 GAGE STEEL. ➁ TorkStar Splice Tube 2¼" O.D. x 14 GAGE x 36". ➂ Screw ½"-13 x 3" zinc grade 5 hex head cap. A ➃ Nut ½"-13 nylon lock nut LT/half/zinc TorkStar Splice Tube.