Transcript
Test Report Number
: GETEC-E6-11-005
Page
2 / 29
CONTENTS Page 1. Client Information .............................................................................................................................................................. 4 1.1 Applicant ........................................................................................................................................................................ 4 1.2 Manufacturer................................................................................................................................................................... 4 2. Descriptions of EUT (Equipment under Test) ................................................................................................................. 5 2.1 Identification of EUT ...................................................................................................................................................... 5 2.2 Support equipment .......................................................................................................................................................... 5 2.3 Used Cable(s).................................................................................................................................................................. 5 2.4 Operating condition during the test ................................................................................................................................. 6 2.5 Evaluation of Immunity .................................................................................................................................................. 6 2.6 Alternative type(s)/model(s); also covered by this test report. ....................................................................................... 6 3. Test summary ...................................................................................................................................................................... 7 3.1 Test regulation ................................................................................................................................................................ 7 3.2 Test results ...................................................................................................................................................................... 7 3.3 Additions, deviations, exclusions from standards ........................................................................................................... 7 4. EUT Modifications.............................................................................................................................................................. 7 5. Conducted disturbance ...................................................................................................................................................... 8 5.1 Operating environment ................................................................................................................................................... 8 5.2 Test set-up ....................................................................................................................................................................... 8 5.3 Measurement uncertainty ................................................................................................................................................ 8 5.4 Test equipment used ....................................................................................................................................................... 8 5.5 Test data for disturbance voltage .................................................................................................................................... 8 6. Radiated disturbance ........................................................................................................................................................ 11 6.1 Operating Environment ................................................................................................................................................. 11 6.2 Test set-up ..................................................................................................................................................................... 11 6.3 Measurement uncertainty .............................................................................................................................................. 11 6.4 Test equipment used ..................................................................................................................................................... 11 6.5 Test data for Radiated disturbance ................................................................................................................................ 12 7. Voltage fluctuations .......................................................................................................................................................... 16 7.1 Operating environment ................................................................................................................................................. 16 7.2 Test equipment used ..................................................................................................................................................... 16 7.3 Test data for voltage fluctuation ................................................................................................................................... 16 8. Electrostatic discharge immunity .................................................................................................................................... 17 8.1 Operating environment ................................................................................................................................................. 17 8.2 Test set-up ..................................................................................................................................................................... 17 8.3 Test equipment used ..................................................................................................................................................... 17 8.4 Test data for Electrostatic discharge immunity ............................................................................................................. 17 GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
Page
3 / 29
9. Radiated RF-electromagnetic field immunity ................................................................................................................ 19 9.1 Operating environment ................................................................................................................................................. 19 9.2 Test set-up ..................................................................................................................................................................... 19 9.3 Test equipment used ..................................................................................................................................................... 20 9.4 Test data for RF-Electromagnetic field immunity ........................................................................................................ 20 10. Electrical fast transient / burst immunity ..................................................................................................................... 21 10.1 Operating Environment ............................................................................................................................................... 21 10.2 Test Set-up .................................................................................................................................................................. 21 10.3 Test Equipment used ................................................................................................................................................... 21 10.4 Test data for EFT/Burst immunity .............................................................................................................................. 21 11. Surge immunity ............................................................................................................................................................... 22 11.1 Operating Environment ............................................................................................................................................... 22 11.2 Test Set-up .................................................................................................................................................................. 22 11.3 Test Equipment used ................................................................................................................................................... 22 11.4 Test data for surge immunity ...................................................................................................................................... 22 12. Conducted RF-electromagnetic field immunity ........................................................................................................... 23 12.1 Operating Environment ............................................................................................................................................... 23 12.2 Test Set-up .................................................................................................................................................................. 23 12.3 Test Equipment used ................................................................................................................................................... 23 12.4 Test data for conducted RF-electromagnetic field immunity ...................................................................................... 23 13. Voltage dips, short interruptions and voltage variations immunity ........................................................................... 24 13.1 Operating environment ............................................................................................................................................... 24 13.2 Test set-up ................................................................................................................................................................... 24 13.3 Test equipment used ................................................................................................................................................... 24 13.4 Test data for voltage dips, short interruptions and voltage variations immunity ........................................................ 24 Appendix Ⅰ – Photograph of test setup: Conducted disturbance ................................................................................... 25 Appendix Ⅱ – Photograph of test setup: Radiated disturbance....................................................................................... 26 Appendix Ⅲ - Photograph of test setup: Current Harmonics / Voltage fluctuations ................................................... 27 Appendix Ⅳ – Photograph of test setup: Electrostatic discharge immunity .................................................................. 27 Appendix Ⅴ – Photograph of test setup: Radiated RF-electromagnetic field immunity ............................................... 28 Appendix Ⅵ – Photograph of test setup: EFT/Burst immunity ....................................................................................... 28 Appendix Ⅶ – Photograph of test setup: Conducted RF-electromagnetic field immunity ............................................ 29
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
1. Client Information 1.1 Applicant -. Company -. Address -. Name of Contact -. Telephone Number -. Fax Number
: GAUS Co., Ltd. : 1-166 Wolam-Dong, Dalseo-Gu, Daegu, 704-832, Korea. : Eui-Yeon, Kim / Director : +82-53-584-4533 : +82-53-584-4535
1.2 Manufacturer -. Company -. Address -. Name of Contact -. Telephone Number -. Fax Number
: GAUS Co., Ltd. : 1-166 Wolam-Dong, Dalseo-Gu, Daegu, 704-832, Korea. : Eui-Yeon, Kim / Director : +82-53-584-4533 : +82-53-584-4535
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
4 / 29
Test Report Number
: GETEC-E6-11-005
Page
5 / 29
2. Descriptions of EUT (Equipment under Test) 2.1 Identification of EUT -. Equipment
: LED Plant Photosynthetic Device
-. Model Name
: BS1101x (x: install place)
-. Serial Number
: Prototype
2.2 Support equipment 2.1.1 Defined as equipment needed for correct operation of the EUT, but not considered as part of the testing and evaluation of the EUT:
Description
Manufacturer
Model Name
Serial Number
None.
-
-
-
Description
Manufacturer
Model Name
Serial Number
None.
-
-
-
2.1.2 System configuration
2.3 Used Cable(s) 2.3.1 The EUT was tested with following cables: Cable Name
Condition
Description
Power cable
Connected to the EUT
1.80 m unshielded
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
2.4 Operating condition during the test -. Test voltage: AC 230 V / 50 Hz -. Test mode: Normal operating mode 2.5 Evaluation of Immunity 2.5.1 Function(s) monitored during & after Immunity test : Check the status value of the light meter.
2.5.2 Performance Criteria
Performance Criterion A The performance of the EUT shall remain within specified operating tolerances.
Performance Criterion B Out-of-tolerance performance is permitted while the EUT is subjected to the applied interference. However, this is only allowed provided that. 1) The performance returns to normal when the interference is removed 2) There is no change of operating state or loss of stored data.
Performance Criterion C The EUT may experience a temporary loss of function and operator intervention is permitted. However, the EUT can be recovered to normal operation by reset.
2.6 Alternative type(s)/model(s); also covered by this test report. -. The difference(s) compared to the EUT is/are: None
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
6 / 29
Test Report Number
: GETEC-E6-11-005
7 / 29
Page
3. Test summary 3.1 Test regulation EN 55015 (2006) + A1 (2007) + A2 (2009): Limits and methods of measurement of radio disturbance characteristics of electrical lighting and similar equipment EN 61547 (2009): Equipment for general lighting purposes - EMC immunity requirements Referring to the following basic standard: EN 61000-4-2 (2009): Electronic discharge immunity test EN 61000-4-3 (2006) + A1 (2008): Radiated radio-frequency electromagnetic immunity test EN 61000-4-4 (2004): Electrical fast transient / Burst immunity test EN 61000-4-5 (2006): Surge immunity test EN 61000-4-6 (2009): Immunity to conducted disturbances, induced by radio-frequency fields EN 61000-4-8 (2010): Power frequency magnetic field immunity test EN 61000-4-11 (2004): Voltage dips, short interruptions and voltage variations immunity test EN 61000-3-2 (2006) + A1 (2009) + A2 (2009): Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current <= 16 A per phase) EN 61000-3-3 (2008): Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current <= 16 A per phase and not subject to conditional connection 3.2 Test results STANDARDS EN 55015
EN 61547
EN 61000-3-2 EN 61000-3-3
Conducted disturbance Radiated disturbance Electrostatic discharge immunity (EN 61000-4-2) Radiated RF electromagnetic fields immunity (EN 61000-4-3) Electrical fast transient / Burst immunity (EN 61000-4-4) Surge immunity (EN 61000-4-5) Conducted disturbances immunity (EN 61000-4-6) Power frequency magnetic field immunity (EN 61000-4-8) Voltage dips, interruptions, variations immunity (EN 61000-4-11) Current Harmonics Voltage fluctuations
Result Pass Pass Pass Pass Pass Pass Pass Pass Pass
Note
1)
2)
-. Note 1) The EUT is not susceptible to magnetic field. Therefore, this testing was skipped. 2) The EUT is a lighting device of less than 25 W and not discharge lighting device. Therefore, this testing was skipped. 3.3 Additions, deviations, exclusions from standards -. None
4. EUT Modifications -. None
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
Page
8 / 29
5. Conducted disturbance 5.1 Operating environment Temperature Relative humidity
: :
24.0 ℃ 39.0 % R.H.
5.2 Test set-up The conducted disturbance measurements were performed in the shielded room. The EUT was placed on wooden table, 0.8 m heights above the floor, 0.4 m from the reference ground plane (GRP) wall and 0.8 m from AMN & ISN. AMN is bonded on horizontal reference ground plane. The ground plane, which was electrically bonded to the shield room, ground system and all power lines entering the shield room, was filtered. 5.3 Measurement uncertainty The measurement uncertainty was calculated in accordance with ISO “Guide to the expression of uncertainty in measurement.” The measurement uncertainty was given with a confidence of 95 %. Test items
Uncertainty
Remark
Conducted emission (9 kHz ~ 150 kHz)
± 2.71 dB
Confidence levels of 95 % (k = 2)
Conducted emission (150 kHz ~ 30 MHz)
± 3.34 dB
Confidence levels of 95 % (k = 2)
5.4 Test equipment used Model Number Manufacturer Description - ESCS30 Rohde & Schwarz EMI Test Receiver - ESH3-Z5 Rohde & Schwarz LISN - ESH2-Z5 Rohde & Schwarz LISN All test equipment used is calibrated on a regular basis.
Serial Number 839809/003 838979/020 829991/009
5.5 Test data for disturbance voltage 5.5.1 Mains terminal -. Test Date -. Resolution bandwidth -. Frequency range
: May 27, 2011 : 9 kHz : 0.15 MHz ~ 30 MHz
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Due to Calibration 12. 10. 2011 12. 10. 2011 12. 10. 2011
Test Report Number
: GETEC-E6-11-005
< Fig 1. Conducted disturbance (Live line) >
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
9 / 29
Test Report Number
: GETEC-E6-11-005
< Fig 2. Conducted disturbance (Neutral line) >
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
10 / 29
Test Report Number
: GETEC-E6-11-005
Page
11 / 29
6. Radiated disturbance 6.1 Operating Environment Temperature Relative Humidity
: :
20.0 ℃ 49.0 % R.H.
6.2 Test set-up A preliminary scan with peak mode was performed in the semi anechoic chamber and found frequency for open area test site. The formal disturbance radiation was measured at 10 m/ 3 m distance open area test site. The EUT was placed on a non-conductive turntable approximately 0.8 m above the ground plane. The turntable with EUT was rotated 360°, and the antenna was varied in height between 1.0 m and 4.0 m in order to determine the maximum emission levels. This procedure was performed for both horizontal and vertical polarization of the receiving antenna. 6.3 Measurement uncertainty The measurement uncertainty was calculated in accordance with ISO “Guide to the expression of uncertainty in measurement.” The measurement uncertainty was given with a confidence of 95 %. Test items(Open Area Test Site)
Uncertainty
Remark
Radiated emission (30 MHz ~ 300 MHz, 10 m, Vertical)
± 4.03 dB
Confidence levels of 95 % (k = 2)
Radiated emission (30 MHz ~ 300 MHz, 10 m, Horizontal)
± 3.96 dB
Confidence levels of 95 % (k = 2)
Radiated emission (300 MHz ~ 1 000 MHz, 10 m, Vertical)
± 4.01 dB
Confidence levels of 95 % (k = 2)
Radiated emission (300 MHz ~ 1 000 MHz, 10 m, Horizontal)
± 3.88 dB
Confidence levels of 95 % (k = 2)
6.4 Test equipment used Model Name - ESCS30
Manufacturer Rohde & Schwarz
Description EMI Test Receiver
Serial Number Due to Calibration 839809/003 12. 10. 2011
- HK116
Rohde & Schwarz
Biconical Antenna
832639/007
03. 15. 2012
- HL223
Rohde & Schwarz
Log Periodic Antenna
835998/004
03. 15. 2012
- HD100
HD GmbH
Position Controller
100/692/01
N/A
- DS415S
HD GmbH
Turntable
415/657/01
N/A
- MA240
HD GmbH
Antenna Mast
240/565/01
N/A
All test equipment used is calibrated on a regular basis.
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
12 / 29
Page
6.5 Test data for Radiated disturbance 6.5.1 Frequency range: 9 kHz ~ 30 MHz -. Test Date -. Resolution Bandwidth -. Loop diameter -. Note
: June 1, 2011 : 200 Hz / 9 kHz :2m 1. The formula of measured value as: Test result = reading + correction factor 2. The correction factor = antenna factor 3. Detector function in the form: PK=Peak, QP=Quasi Peak, AV= Average 4. All not in the table noted test results are more than 20 dB below relevant limits. 5. dBµV convertor dBµA 1:1
X axis Frequency (MHz) 0.065 0.130 0.198
Reading (dBµV) 32.54 23.24 17.59
Correction factor (dB) 0 0 0
Y axis Frequency (MHz) 0.130 0.198 0.262 0.326
Reading (dBµV) 43.62 36.60 34.46 27.75
Correction factor (dB) 0 0 0 0
Z axis Frequency (MHz) 0.065 0.130 0.198 0.262
Reading (dBµV) 24.28 14.29 9.49 7.84
Correction factor (dB) 0 0 0 0
GUMI COLLEGE EMC CENTER
Detector PK PK PK
Detector PK PK PK PK
Detector PK PK PK PK
Test result (dBµA) 32.54 23.24 17.59
Limit (dBµA) 55.46 63.42 54.66
Margin (dB) 88.00 40.18 37.07
Test result (dBµA) 43.62 36.60 34.46 27.75
Limit (dBµA) 63.63 54.66 51.29 48.67
Margin (dB) 20.01 18.06 16.83 20.92
Test result (dBµA) 24.28 14.29 9.49 7.84
Limit (dBµA) 88.00 63.51 54.66 51.29
Margin (dB) 63.72 49.22 45.17 43.45
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
< Fig 5. Graph of Radiated disturbance (X axis) >
< Fig 6. Graph of Radiated disturbance (Y axis) >
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
13 / 29
Test Report Number
: GETEC-E6-11-005
< Fig 7. Graph of Radiated disturbance (Z axis) >
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
14 / 29
Test Report Number
: GETEC-E6-11-005
-. Test Date
: May 27, 2011
-. Resolution Bandwidth
: 120 kHz
-. Frequency Range
: 30 MHz ~ 300 MHz
-. Measurement Distance
: 10 m
-. Note
: None.
Test model: Detector mode: Quasi- peak detector mode
< Fig 11. Graph of Radiated disturbance (30 MHz ~ 300 MHz) >
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
15 / 29
Test Report Number
: GETEC-E6-11-005
Page
16 / 29
7. Voltage fluctuations 7.1 Operating environment Temperature Relative humidity
: :
26.0 ℃ 38.0 % R.H.
7.2 Test equipment used Model Number Manufacturer - 360AMX Pacific - PM6000 VOLTECH - IEC555 reference impedance network VOLTECH All test equipment used is calibrated on a regular basis.
Description AC Power Source Universal Power Analyzer Impedance network
Serial Number 0438 100006700132 5016
"The measuring instrumentation is according to IEC 61000-4-15 standard." 7.3 Test data for voltage fluctuation -. Test date: June 14, 2011 Operating condition: Steady-state operating mode
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Due to Calibration N/A 04. 26. 2011 10. 20. 2011
Test Report Number
: GETEC-E6-11-005
Page
17 / 29
8. Electrostatic discharge immunity 8.1 Operating environment Parameters required prior to the test
Parameters recorded during the test
(15.0 ~ 35.0) C (30.0 ~ 60.0) % R.H. (86.0 ~ 106.0) kPa
Temperature Relative Humidity Air pressure
25.0 C 39.0 % R.H. 100.4 kPa
8.2 Test set-up The EUT was placed on a non-metallic support 0.8 m above a ground reference plane (GRP). The EUT was put into operation according to the specified operating mode. The VCP (vertical coupling plane) were connected to the GRP with cables contain two 470 kΩ resistors. Ungrounded equipment, or ungrounded part(s) of equipment, cannot discharge itself similarly to class I mains-supplied equipment. If the charge is not removed before the next ESD pulse is applied, it is possible that the EUT or part(s) of the EUT be stressed up to twice the intended test voltage. Therefore, double-insulated equipment could be charged at an unrealistically high charge, by accumulating several ESD discharges on the capacitance of the class II insulation, and then discharge at the breakdown voltage of the insulation with a much higher energy. In the case of class II & III equipment, to avoid of unrealistically high charge, it is possible to ionize “using ionizer” before each discharge. 8.3 Test equipment used Model Number Manufacturer Description - PESD3000 Haefely ESD Generator The test equipment used is calibrated on a regular basis.
Serial Number H012055
Due to Calibration 12. 16. 2011
8.4 Test data for Electrostatic discharge immunity Test date: June 3, 2011 Test Standard Required Performance Criteria Discharge voltage Contact Discharge voltage Air Number of discharges Test Points of discharge point
: EN 61000-4-2 (2009) :B : ± 2 kV, ± 4 kV : ± 2 kV, ± 4 kV, ± 8 kV : Each 10 times Each location on the surface touchable by hand HCP/VCP: 0.1 m from the four sides of the EUT. * See following photo of discharge point (Blue line is contact discharge and red line is air discharge.)
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
Page
18 / 29
2
1
Test point
Voltage (kV)
Coupling
Result(Criteria)
HCP
± 2, ± 4
Contact Discharge
Pass(A)
VCP
± 2, ± 4
Contact Discharge
Pass(A)
± 2, ± 4
Contact Discharge
Pass(A)
#1, Body
#2, LED ± 2, ± 4, ± 8 Air Discharge Comment: No operation errors were detected during or after this testing.
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Pass(A)
Test Report Number
: GETEC-E6-11-005
Page
19 / 29
9. Radiated RF-electromagnetic field immunity 9.1 Operating environment Parameters required prior to the test Temperature Relative Humidity Air pressure
(15.0 ~ 35.0) C (10.0 ~ 75.0) % R.H. (86.0 ~ 106.0) kPa
Parameters recorded during the test 23.0 C 45.0 % R.H. 100.9 kPa
9.2 Test set-up The EUT was placed on a non-metallic support 0.8 m above a ground reference plane (GRP) and was put into operation according to the specified operating mode. Ferrite tiles were placed on the GRP between the EUT and the transmission antenna to reduce the reflections from GRP as below drawing.
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
9.3 Test equipment used Model Number Manufacturer Description - SMT 03 Rohde & Schwarz Signal Generator - NRVD Rohde & Schwarz Dual Channel Power Meter - URV5-Z2 Rohde & Schwarz 10V insertion unit - URV5-Z2 Rohde & Schwarz 10V insertion unit - HL562 Rohde & Schwarz Ultra Broadband Antenna - DC6180 Amplifier Research Dual Directional Coupler - DC7144 Amplifier Research Dual Directional Coupler - FM5004 Amplifier Research Field Monitor - AR-250W Amplifier Research Power Amplifier - 60S1G3 Amplifier Research Power Amplifier - TS-RSP Rohde & Schwarz RF-System Panel - PSU Rohde & Schwarz Power Switch Unit All test equipment used is calibrated on a regular basis.
Page
Serial Number 839227/020 837794/048 837630/012 835640/020 361324/007 300338 307795 300344 300679 308059 100072 N/A
Due to Calibration 12. 10. 2011 12. 10. 2011 10. 20. 2011 10. 20. 2011 N/A N/A N/A N/A 10. 20. 2011 10. 20. 2011 N/A N/A
9.4 Test data for RF-Electromagnetic field immunity Test date: June 3, 2011 Test Standard Required Performance Criteria Distance of antenna – EUT Modulation Dwell time Frequency Step
: EN 61000-4-3 (2006) + A1 (2008) :A :3m : AM: 80 %, 1 kHz :3s :1%
Frequency Range Polarity Field Strength Exposed side (V/m) (MHz) (H/V) 80 ~ 1 000 Front H 3 80 ~ 1 000 Rear H 3 80 ~ 1 000 Left H 3 80 ~ 1 000 Right H 3 80 ~ 1 000 Front V 3 80 ~ 1 000 Rear V 3 80 ~ 1 000 Left V 3 80 ~ 1 000 Right V 3 Comment: No operation errors were detected during or after this testing.
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
20 / 29
Result(Criteria) Pass(A) Pass(A) Pass(A) Pass(A) Pass(A) Pass(A) Pass(A) Pass(A)
Test Report Number
: GETEC-E6-11-005
Page
21 / 29
10. Electrical fast transient / burst immunity 10.1 Operating Environment Parameters required prior to the test
Parameters recorded during the test
(15.0 ~ 35.0) C (10.0 ~ 75.0) % R.H. (86.0 ~ 106.0) kPa
Temperature Relative Humidity Air pressure
26.0 C 49.0 % R.H. 100.9 kPa
10.2 Test Set-up The EUT was placed on an insulating support of 0.1 m heights above a ground reference plane (GRP). The ground reference was placed in a wooden table 0.8 m above the reference plane. The EUT was put into operation according to the specified operating mode. 10.3 Test Equipment used Model Number Manufacturer Description - UCS500M6 EM TEST AG Ultra compact simulator - HFK EM TEST AG Capacitive coupling clamp All test equipment used is calibrated on a regular basis.
Serial Number Due to Calibration 0500-10 12. 10. 2011 N/A 10. 20. 2011
10.4 Test data for EFT/Burst immunity Test date: June 3, 2011 Test Standard Required Performance Criteria Port
Burst Characteristic
Test port
: EN 61000-4-4 (2004) :B AC Power Port (Type: 0.50 m unshielded) DC Power Port (Type: ) Signal/Data/Telecom Port (Type: Tr
Test level (kV)
5 ns
Td
50 ns
Coupling
L ± 1 CDN N ± 1 CDN PE ± 1 CDN L-N ± 1 CDN L-PE ± 1 CDN N-PE ± 1 CDN L-N-PE ± 1 CDN Comment: No operation errors were detected during or after this testing.
GUMI COLLEGE EMC CENTER
Fburst
) 5 kHz
Trep
300 ms
Coupling time (s)
Result(Criteria)
60 60 60 60 60 60 60
Pass(A) Pass(A) Pass(A) Pass(A) Pass(A) Pass(A) Pass(A)
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
Page
22 / 29
11. Surge immunity 11.1 Operating Environment Parameters required prior to the test
Parameters recorded during the test
(15.0 ~ 35.0) C (10.0 ~ 75.0) % R.H. (86.0 ~ 106.0) kPa
Temperature Relative Humidity Air pressure
26.0 C 49.0 % R.H. 100.9 kPa
11.2 Test Set-up The EUT was placed on an insulating support of 0.1 m heights above a ground reference plane (GRP). The ground reference was placed in a wooden table 0.8 m above the reference plane. The EUT was put into operation according to the specified operating mode. 11.3 Test Equipment used Model Number Manufacturer Description - UCS500M6 EM TEST AG Ultra compact simulator - TSS500 EM TEST AG Tel. Surge Generator - CNV508S1 EM TEST AG CDN All test equipments used is calibrated on a regular basis.
Serial Number 0500-10 0200-05 V0620101427
Due to Calibration 12. 10. 2011 12. 10. 2011 N/A
11.4 Test data for surge immunity Test date: June 3, 2011 Test Standard Required Performance Criteria Port
Source Impedance Number of surges Repetition rate
Test port
: EN 61000-4-5 (2006) :B AC Power Port (Type: 0.50 m unshielded) DC Power Port (Type: ) Signal/Data/Telecom Port (Type: ) 2 Ω + 18 µF_ Differential Mode 12 Ω + 9 µF_ Common Mode 42 Ω + 0.1 µF_ Common Mode : 5 surges/polarity : 60 s
Mode (Diff. / Comm.)
Test level (kV)
Phase ( °)
L-N Diff. ± 0.5 0, 90, 180, 270 L-PE Comm. ± 0.5, ± 1 0, 90, 180, 270 N-PE Comm. ± 0.5, ± 1 0, 90, 180, 270 Comment: No operation errors were detected during or after this testing.
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Result(Criteria)
Pass(A) Pass(A) Pass(A)
Test Report Number
: GETEC-E6-11-005
Page
23 / 29
12. Conducted RF-electromagnetic field immunity 12.1 Operating Environment Parameters required prior to the test
Parameters recorded during the test
(15.0 ~ 35.0) C (10.0 ~ 75.0) % R.H. (86.0 ~ 106.0) kPa
Temperature Relative Humidity Air pressure
26.0 C 49.0 % R.H. 100.9 kPa
12.2 Test Set-up The EUT was placed on an insulating support of 0.1 m heights above a ground reference plane (GRP). All relevant cables shall be provided with appropriate CDN and/or injection clamp at a distance between 0.1 m and 0.3 m from EUT on the GRP. The EUT was put into operation according to the specified operating mode. 12.3 Test Equipment used Model Name
Manufacturer
Description
- CWS500C EM TEST AG CE Immunity Simulator - NRVS Rhode & Schwarz Single Channel Power Meter - M2 EM TEST AG CDN M2 - M3 EM TEST AG CDN M3 - M3 EM TEST AG CDN M3 - S15 EM TEST AG CDN S15 - URV5-Z4 Rhode & Schwarz 100 V Insertion Unit - F-2031-23mm FCC EM Clamp All test equipments used is calibrated on a regular basis.
Serial Number
Due to Calibration
0500-01 100298 0004003C 0008200C 51001032011 0004039C 100006 328
12. 10. 2011 12. 10. 2011 12. 10. 2011 12. 10. 2011 12. 10. 2011 12. 10. 2011 10. 20. 2011 07. 22. 2011
12.4 Test data for conducted RF-electromagnetic field immunity Test date: June 3, 2011 Test Standard Required Performance Criteria Port
Modulation Dwell time Frequency Step
: EN 61000-4-6 (2009) :A AC Power Port (Type: 0.50 m unshielded) DC Power Port (Type: ) Signal/Data/Telecom Port(Type: : AM: 80 %, 1 kHz :3s :1%
)
Test model: Adapter #1, Adapter #2 Frequency Range (MHz)
Test port
Coupling device
0.15 ~ 80 AC Power CDN M3 Comment: No operation errors were detected during or after this testing.
GUMI COLLEGE EMC CENTER
Field Strength (V)
Result(Criteria)
3
Pass(A)
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Test Report Number
: GETEC-E6-11-005
Page
24 / 29
13. Voltage dips, short interruptions and voltage variations immunity 13.1 Operating environment Parameters required prior to the test
Parameters recorded during the test
(15.0 ~ 35.0) C (10.0 ~ 75.0) % R.H. (86.0 ~ 106.0) kPa
Temperature Relative Humidity Air pressure
26.0 C 49.0 % R.H. 100.9 kPa
13.2 Test set-up The EUT was connected to the test generator with the shortest power supply cable as specified by the EUT manufacturer. The EUT was put into operation according to the specified operating mode. 13.3 Test equipment used Model Name Manufacturer Description - UCS500M6 EM TEST AG Ultra compact simulator - RRTMOG EN10 EM TEST AG Motor driven VARIAC All test equipments used is calibrated on a regular basis.
Serial Number Due to Calibration 0500-10 12. 10. 2011 D3869 N/A
13.4 Test data for voltage dips, short interruptions and voltage variations immunity Test date: June 3, 2011 Test Standard Required Performance Criteria Test Power rate Test Level
: EN 61000-4-11 (2004) Voltage dips: C Short interruptions: B : AC (100, 240) V / 50 Hz ΔUT
Duration(ms)
30 %
10 p (200)
> 95 %
0.5 p (10)
Number of Reductions
: 3 times of each level
Reduction Intervals
: 10 s
Voltage Reductions
Duration
Test Item
( % UT) ( ms ) Dips 30 200 Interruptions > 95 10 Comment: No operation errors were detected during or after this testing.
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Result(Criteria) Pass(A) Pass(A)
Test Report Number
: GETEC-E6-11-005
Appendix Ⅰ – Photograph of test setup: Conducted disturbance
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
25 / 29
Test Report Number
: GETEC-E6-11-005
Appendix Ⅱ – Photograph of test setup: Radiated disturbance
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
26 / 29
Test Report Number
: GETEC-E6-11-005
Appendix Ⅲ - Photograph of test setup: Current Harmonics / Voltage fluctuations
Appendix Ⅳ – Photograph of test setup: Electrostatic discharge immunity
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
27 / 29
Test Report Number
: GETEC-E6-11-005
Appendix Ⅴ – Photograph of test setup: Radiated RF-electromagnetic field immunity
Appendix Ⅵ – Photograph of test setup: EFT/Burst immunity
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
28 / 29
Test Report Number
: GETEC-E6-11-005
Appendix Ⅶ – Photograph of test setup: Conducted RF-electromagnetic field immunity
GUMI COLLEGE EMC CENTER
407, Bugok-dong, Gumi-Si, Gyeongbuk 730-711, Korea. Tel; +82-54-440-1194~1198 Fax; +82-54-440-1199
Page
29 / 29