Preview only show first 10 pages with watermark. For full document please download

Years

   EMBED


Share

Transcript

2006 LIGHTING ALTERNATIVES TO MEET THE ENERGY CODES Classroom Applications Classroom Space: Retrofit Retrofit Project „ 25 ft x 30 ft ~ 750 sq ft space „ 9.5 ft ceiling height „ 9 3-lamp parabolic „ 10 ft x 10 ft fixture spacing „ IES recommended target illuminance: 30-50 fc „ 80/50/20 reflectances „ 3 hours on, 3 starts per day, 180 days per year Impact of Energy Codes on Classrooms „ ASHRAE/IESNA Standard 90.1 „ „ Space-by-Space Method: „ 2001 – 1.6 W/sq ft „ 2004 – 1.4 W/sq ft Building Area Method: „ 2001 – 1.5 W/sq ft „ 2004 – 1.2 W/sq ft „ CA Title 24, Part 6* „ „ Area Category Method „ 2005 – 1.2 W/sq ft Complete Building Method „ 2005 – 1.2 W/sq ft Classroom Retrofit Project 3-lamp Systems System Wattage Watts per sq ft Maint. FC Pass//Fail ASHRAE 2001/2004 % Beats 90.1 -2001 Bldg Method (%/Ded.) F34CW/SS MB2x40/277RS & MB1x40/277RS 121 1.45 44 √/Χ 3% $0.00 FO32/741/ECO QTP3x32T8/UNV ISN 87 1.04 47 √/√ 31% $0.42 FO30/XP/SS/ECO QHE3x32T8/UNV ISN 77 0.92 48 √/√ 39% $0.58 FO28/XP/SS/ECO QHE3x32T8/UNV ISN 72 0.86 45 √/√ 43% $0.60 FO30/XP/SS/ECO QHE3x32T8/UNV ISL 68 0.82 42 √/√ 45% $0.60 FO32/XPS/ECO QTP3x32T8/UNV PSX 71 0.85 42 √/√ 43% $0.60 * Lighting power adjustment factors available when passive controls are used System Comparisons Classroom Retrofit Project 3-lamp Systems Ballast Factor Initial System Lumens Mean System Lumens* Lumen Maint. System Wattage** Lamp Life (3 hrs/start) FO32/741/ECO QTP3x32T8/UNV ISN 0.88 7392 (100%) 6653 (100%) 0.90 87 (100%) 15,000 FO30/XP/SS/ECO QHE3x32T8/UNV ISN 0.88 7524 (102%) 7075 (106%) 0.94 77 (89%) 24,000 FO28/XP/SS/ECO QHE3x32T8/UNV ISN 0.88 7194 (97%) 6758 (101%) 0.94 72 (83%) 24,000 FO30/XP/SS/ECO QHE3x32T8/UNV ISL 0.78 6669 (90%) 6271 (95%) 0.94 68 (78%) 24,000 FO32/XPS/ECO QTP3x32T8/UNV PSX 0.71 6603 (89%) 6273 (94%) 0.95 71 (82%) 30,000 * Mean system lumens based on light at 40% of rated life ** System wattage based on 277V 5 Classroom Retrofit Project 2x4 Parabolic Fixtures % Relative Life Cycle Cost % Relative Energy Consumption Relative Payback (years) 110% 3 100% 100% 2.54 100% 2.48 91% 2.04 89% 90% 2.5 2 86% 83% 81% 81% 80% 82% 1.5 78% 70% 1 0.82 60% 50% 0.5 0 FO32/741/ECO QTP3x 32T8/UNV ISN 0 FO30/841/XP/SS/ECO QHE 3x32T8/UNV ISN FO28/841/XP/SS/ECO QHE 3x 32T8/UNV ISN 6 FO30/841/XP/SS/ECO QHE 3x 32T8/UNV ISL FO32/841/XPS/ECO QTP 3x32T8/UNV PSX Energy, Economics & Light Levels Classroom Retrofit Project 3-lamp Systems Energy Cost per Year* Relative Energy Savings Life Cycle Cost** Relative Simple Payback (Years) Lighting Power Density (W/ft2) Average Maintained Illuminance (FC) FO32/741/ECO QTP3x32T8/UNV ISN $127 ---- $5100 --- 1.04 (100%) 47 FO30/XP/SS/ECO QHE3x32T8/UNV ISN $112 11% $4600 (90%) 2.5 0.92 (88%) 48 FO28/XP/SS/ECO QHE3x32T8/UNV ISN $105 17% $4400 (86%) 2.0 0.87 (84%) 45 FO30/XP/SS/ECO QHE3x32T8/UNV ISL $99 22% $4100 (80%) 0.8 0.82 (79%) 42 FO32/XPS/ECO QTP3x32T8/UNV PSX $104 18% $4100 (80%) 2.5 0.85 (82%) 42 * Based on $0.10/kW-h. 9 hr burn cycle per day, 5 days a week, and 36 weeks per year ** Based on AUP’s for lamps and ballasts and 60,000 hrs 7 Classroom Space: New Construction New Construction Project „ 25 ft x 30 ft ~ 750 sq ft space „ 9.5 ft ceiling height „ 12 2-lamp direct/indirect pendant fixtures „ 1.5 ft from ceiling to top of fixture „ 80/50/20 reflectances „ IES recommended target illuminance: 30-50 fc „ 3 hours on, 3 starts per day, 180 days per year Impact of Energy Codes on Classrooms „ ASHRAE/IESNA Standard 90.1 „ „ Space-by-Space Method: „ 2001 – 1.6 W/sq ft „ 2004 – 1.4 W/sq ft Building Area Method: „ 2001 – 1.5 W/sq ft „ 2004 – 1.2 W/sq ft „ CA Title 24, Part 6* „ „ Area Category Method „ 2005 – 1.2 W/sq ft Complete Building Method „ 2005 – 1.2 W/sq ft System Wattage Watts per sq ft Maint. FC LEED v.2.2 Points Earned F34CW/SS MB2x40/277RS-SRNK 77 1.23 30 0 √/Χ 18% $0.00 FO32/741/ECO QTP2x32T8/UNV ISN 59 0.94 41 4 √/√ 37% $0.54 FO30/XP/SS/ECO QHE2x32T8/UNV ISL 45 0.72 37 9 √/√ 52% $0.60 FO28/XP/SS/ECO QHE2x32T8/UNV ISL 42 0.67 36 10 √/√ 55% $0.60 FO32/XPS/ECO QTP2x32T8/UNV PSX 46 0.74 37 8 √/√ 51% $0.60 FO30/XP/SS/ECO QTP2x32T8/UNV PSX 43 0.69 34 10 √/√ 54% $0.60 Classroom New Construction 2-lamp Systems * Lighting power adjustment factors available when passive controls are used Pass//Fail ASHRAE 2001/2004 ** % Beats 90.1-2001 Bldg Method (%/Ded.) System Comparisons Classroom New Construction 2-lamp Systems Ballast Factor Initial System Lumens Mean System Lumens* Lumen Maint. System Wattage** Lamp Life (3 hrs/start) FO32/741/ECO QTP2x32T8/UNV ISN 0.88 4928 (100%) 4435 (100%) 0.90 59 (100%) 15,000 FO30/XP/SS/ECO QHE2x32T8/UNV ISL 0.78 4446 (90%) 4181 (94%) 0.94 45 (76%) 24,000 FO28/XP/SS/ECO QHE2x32T8/UNV ISL 0.78 4251 (86%) 3994 (90%) 0.94 42 (71%) 24,000 FO32/XPS/ECO QTP2x32T8/UNV PSX 0.71 4402 (89%) 4182 (94%) 0.95 46 (78%) 30,000 FO30/XP/SS/ECO QTP2x32T8/UNV PSX 0.71 4047 (82%) 3806 (86%) 0.94 43 (73%) 30,000 * Mean system lumens based on light at 40% of rated life ** System wattage based on 277V 10 Classroom New Construction Project Indirect Fixtures % Relative Life Cycle Cost % Relative Energy Consumption Relative Payback (years) 110% 3 2.85 100% 100% 100% 2.5 2.33 90% 2 80% 80% 78% 76% 1.5 78% 76% 73% 73% 71% 0.92 70% 1 0.96 60% 50% 0.5 0 FO32/741/ECO QTP2x 32T8/UNV ISN 0 FO30/841/XP/SS/ECO QHE 2x 32T8/UNV ISL FO28/841/XP/SS/ECO QHE 2x32T8/UNV ISL FO32/841/XPS/ECO QTP FO30/841/XP/SS/ECO 2x 32T8/UNV PSX QTP 2x 32T8/UNV PSX Energy, Economics & Light Levels Classroom New Construction 2-lamp Systems Energy Relative Life Cycle Cost per Energy Cost** Savings Year* Relative Simple Payback (years) Lighting Power Density (W/ft2) Average Maintained Illuminance (FC) FO32/741/ECO QTP2x32T8/UNV ISN $115 --- $4,700 (100%) --- 0.94 (100%) 41 FO30/XP/SS/ECO QHE2x32T8/UNV ISL $87 24% $3,800 (81%) 0.9 0.72 (77%) 37 FO28/XP/SS/ECO QHE2x32T8/UNV ISL $82 29% $3,600 (77%) 1.0 0.67 (71%) 36 FO32/XPS/ECO QTP2x32T8/UNV PSX $89 22% $3,700 (79%) 2.9 0.74 (79%) 37 FO30/XP/SS/ECO QTP2x32T8/UNV PSX $84 27% $3,500 (74%) 2.3 0.69 (73%) 34 * Based on $0.10/kW-h. 9 hr burn cycle per day, 5 days a week, and 36 weeks per year ** Based on AUP’s for lamps and ballasts and 60,000 hrs 12 Hospital Applications Hospital Space Retrofit or New Construction „ 25 ft x 30 ft ~ 750 sq ft space „ 9.5 ft ceiling height „ 9 3-lamp parabolic fixtures „ 10 ft x 10 ft fixture spacing „ IES recommended target illuminance: 30-50 fc „ 80/50/20 reflectances „ 24 hr operation w/o occupancy sensors (nursing stations, corridors, waiting rooms) Impact of Energy Codes on Hospitals/Medical Buildings „ ASHRAE/IESNA Standard 90.1 „ „ Space-by-Space Method: „ 2001 – 1.5 W/sq ft „ 2004 – 1.3 W/sq ft Building Area Method: „ 2001 – 1.6 W/sq ft „ 2004 – 1.2 W/sq ft „ CA Title 24, Part 6* „ „ Area Category Method: „ 2005 – 1.2 W/sq ft Complete Building Method: „ 2005 – 1.1 W/sq ft Hospital Retrofit/New Construction 3-lamp Systems System Wattage Watts per sq ft Maint. FC LEED v.2.2 Points Earned Pass//Fail ASHRAE 2001/2004 % Beats 90.1 -2001 Bldg Method (%/Ded.) F34CW/SS MB2x40/277RS & MB1x40/277RS 121 1.5 44 0 √/Χ 6% $0.00 FO32/741/ECO QTP3x32T8/UNV ISN 87 1.0 47 2 √/√ 38% $0.56 FO28/XP/SS/ECO QHE3x32T8/UNV ISN 72 0.86 45 6 √/√ 46% $0.60 FO30/XP/SS/ECO QHE3x32T8/UNV ISL 68 0.82 42 7 √/√ 49% $0.60 FO32/XPS/ECO QTP3x32T8/UNV PSX 71 0.85 42 6 √/√ 47% $0.60 FO28/XP/SS/ECO QTP3x32T8/UNV PSX 62 0.74 37 8 √/√ 54% $0.60 * Lighting power adjustment factors available when passive controls are used System Comparisons Hospital Retrofit/New Construction 3-lamp Systems Ballast Factor Initial System Lumens Mean System Lumens* Lumen Maint. System Wattage** Lamp Life (cont.) FO32/741/ECO QTP3x32T8/UNV ISN 0.88 7392 (100%) 6653 (100%) 0.90 87 (100%) 26,000 FO28/XP/SS/ECO QHE3x32T8/UNV ISN 0.88 7194 (97%) 6758 (102%) 0.94 72 (83%) 32,000 FO30/XP/SS/ECO QHE3x32T8/UNV ISL 0.78 6669 (90%) 6271 (94%) 0.94 68 (78%) 32,000 FO32/XPS/ECO QTP3x32T8/UNV PSX 0.71 6603 (89%) 6273 (94%) 0.95 71 (82%) 36,000 FO28/XP/SS/ECO QTP3x32T8/UNV PSX 0.71 5804 (79%) 5453 (82%) 0.94 62 (71%) 36,000 * Mean system lumens based on light at 40% of rated life ** System wattage based on 277V 16 Hospital Retrofit/New Construction 2x4 Parabolic Fixtures % Relative Life Cycle Cost % Relative Energy Consumption Relative Payback (years) 110% 0.5 0.46 100% 100% 100% 0.4 0.38 0.33 90% 86% 0.3 83% 82% 81% 80% 82% 78% 72% 71% 0.2 70% 0.15 0.1 60% 50% 0 0 FO32/741/ECO QTP3x32T8/UNV ISN FO28/841/XP/SS/ECO QHE 3x32T8/UNV ISN FO30/841/XP/SS/ECO QHE 3x32T8/UNV ISL 17 FO32/841/XPS/ECO QTP 3x32T8/UNV PSX FO28/841/XP/SS/ECO QTP 3x32T8/UNV PSX Energy, Economics & Light Levels Hospital Retrofit/New Construction 3-lamp Systems Energy Cost per Year* Relative Energy Savings Life Cycle Cost** Relative Simple Payback (Years) Lighting Power Density (W/ft2) Average Maintained Illuminance (FC) FO32/741/ECO QTP3x32T8/UNV ISN $684 --- $5100 (100%) --- 1.0 (100%) 47 FO28/XP/SS/ECO QHE3x32T8/UNV ISN $566 17% $4400 (86%) 0.4 0.86 (86%) 45 FO30/XP/SS/ECO QHE3x32T8/UNV ISL $535 22% $4100 (80%) 0.2 0.82 (82%) 42 FO32/XP/SS/ECO QTP3x32T8/UNV PSX $558 18% $4100 (80%) 0.5 0.85 (85%) 42 FO28/XP/SS/ECO QTP3x32T8/UNV PSX $487 29% $3700 (73%) 0.3 0.74 (74%) 37 * Based on $0.10/kW-h. 24 hr continuous burn, 7 days a week, and 52 weeks per year Based on AUP’s for lamps and ballasts and 60,000 hrs ** 18 Industrial Applications Warehouse Space „ General Layout „ „ „ „ „ Open high bay warehouse space IES recommended target illuminance for warehousing and storage: 10-30 fc. 60’x80’x30’ 70/30/10 reflectances Conditioned space (25°C) „ Baseline system: „ „ 400W std. metal halide/mag. ballast 9 open high bay aluminum reflectors „ Criteria „ „ 1 for 1 retrofit Illumimance levels meet IES recommendations System Comparison – Equal Luminaires Warehouse Space System Wattage* Number of Luminaires Average Maintained Illuminance (FC) M400/U-CWA Ballast Aluminum high bay 458 9 28.6 0.86 MS250PS-Mag. Ballast Prismatic high bay 290 9 16.2 0.47 4-lamp T5HO Aluminum high bay 236 9 17.7 0.44 6-lamp T5HO Aluminum high bay 356 9 27.1 0.67 6-lamp T8/QHE ISN Aluminum high bay 164 9 13.4 0.31 6-lamp T8/QHE ISH Aluminum high bay 218 9 18.0 0.41 * System wattage based on 277V Lighting Power Density (W/ft2) System Comparison – Equal Luminaires Warehouse Space System Wattage* Number of Luminaires Annual Operating Cost** Relative Operating Cost Savings M400/U-CWA Ballast Aluminum high bay 458 9 $2,400 ------ MS250PS-Mag. Ballast Prismatic high bay 290 9 $1,500 $880 (37%) 4-lamp T5HO Aluminum high bay 236 9 $1,200 $1,200 (48%) 6-lamp T8/QHE ISH Aluminum high bay 218 9 $1,100 $1,300 (52%) * System wattage based on 277V ** 5840 hours/year at $0.10/kWh Impact of Energy Codes on Warehouse Space „ ASHRAE/IESNA Standard 90.1 „ „ „ Warehouse Space System Wattage Lighting Power Density (W/ft2) Maint (FC) Pass/Fail ASHRAE 2001/2004 % Beats 90.1 - 2001 Sp by Sp (%/Ded.) M400/U-CWA Ballast Aluminum high bay 458 0.86 29 √/Χ 22% $0.00 4-lamp T5HO Aluminum high bay 236 0.44 18 √/√ 60% $0.60 6-lamp T5HO Aluminum high bay 356 0.67 27 √/√ 39% $0.00 Warehouse 6-lamp T8/QHE ISH „ MUST exceed by 50% Aluminum high bay „ No “Sliding Scale” 218 0.41 18 √/√ 63% $0.60 Warehouse High Bay „ Active storage Space-by-Space Method: „ 2001 – 1.1 W/sq ft „ 2004 – 0.8 W/sq ft Building Area Method: „ 2001 – 1.2 W/sq ft „ 2004 – 0.8 W/sq ft „ REMEMBER „ Application: Warehouse Before HPS After PENTRON® T5HO Application: Warehouse w/ PENTRON T5HO Industrial Manufacturing Space „ General Layout „ „ „ „ „ Open Industrial Manufacturing Space Target Illuminance: 50 fc. 60’x80’x30’ 70/30/10 reflectances Conditioned space (25°C) „ Baseline system: „ „ 400W std. metal halide/mag. ballast 24 open high bay aluminum reflectors „ Criteria „ „ 1 for 1 retrofit Illumimance levels meet IES recommendations System Comparison – Equal Luminaires Industrial Manufacturing Space System Wattage* Number of Luminaires Average Maintained Illuminance (FC) M400/U-CWA Ballast Aluminum high bay 458 24 53 2.29 MS250PS-Mag. Ballast Prismatic high bay 290 24 45 1.45 4-lamp T5HO Aluminum high bay 236 24 50 1.18 6-lamp T5HO Aluminum high bay 356 24 57 1.78 6-lamp T8/HE ISN Aluminum high bay 164 24 36 0.82 6-lamp T8/HE ISH Aluminum high bay 218 24 53 1.09 * System wattage based on 277V Lighting Power Density (W/ft2) System Comparison – Equal Luminaires Industrial Manufacturing Space System Wattage* Number of Luminaires Annual Operating Cost** Operating Cost Savings M400/U-CWA Ballast Aluminum high bay 458 24 $6500 ------ MS250PS-Mag. Ballast Prismatic high bay 290 24 $4100 $2500 (38%) 4-lamp T5HO Aluminum high bay 236 24 $3300 $3200 (50%) 6-lamp T8/HE ISH Aluminum high bay 218 24 $3100 $3500 (53%) * System wattage based on 277V ** 5840 hours/year at $0.10/kWh Impact of Energy Codes on Industrial Manufacturing Space „ ASHRAE/IESNA Standard 90.1 „ „ Manufacturing High Bay Space-by-Space Method: „ 2001 – 3.0 W/sq ft „ 2004 – 1.7 W/sq ft Maint (FC) Pass/Fail ASHRAE 2001 % Beat Sp by Sp %/$Ded ASHRAE 2001 Industrial Manufacturing Space System Wattage* Lighting Power Density (W/ft2) M400/U-CWA Ballast Aluminum high bay 458 2.29 53 √ 23% $0.00 4-lamp T5HO Aluminum high bay 236 1.18 50 √ 60% $0.60 6-lamp T5HO Aluminum high bay 356 1.78 57 √ 40% $0.60 6-lamp T8/HE ISH Aluminum high bay 218 1.09 53 √ 63% $0.60 Open Office Applications Open Office Space: Retrofit Retrofit Project „ 90 ft x 100 ft ~ 9000 sq ft space „ 9.5 ft ceiling height „ 81 3-lamp parabolic recessed fixtures „ 10 ft x 8 ft fixture spacing „ IES recommended target illuminance: 30-50 fc „ 80/50/20 reflectances „ 12 hrs per day, 5 days per week, 50 weeks per year Impact of Energy Codes on Open Offices „ ASHRAE/IESNA Standard 90.1 „ „ Space-by-Space Method: „ 2001 – 1.3 W/sq ft „ 2004 – 1.1 W/sq ft Building Area Method: „ 2001 – 1.3 W/sq ft „ 2004 – 1.0 W/sq ft „ CA Title 24, Part 6* „ „ Area Category Method „ 2005 – 1.2 W/sq ft Complete Building Method „ 2005 – 1.1 W/sq ft Maint. FC Pass/Fail ASHRAE 2001/2004 % Beats 90.1 -2001 Bldg Method (%/Ded.) 1.09 35 √/Χ 16% $0.00 87 0.78 37 √/√ 40% $0.60 FO30/XP/SS/ECO QHE3x32T8/UNV ISN 77 0.69 38 √/√ 47% $0.60 FO28/XP/SS/ECO QHE3x32T8/UNV ISL 63 0.57 32 √/√ 56% $0.60 FO32/XPS/ECO QTP3x32T8/UNV PSX 71 0.64 33 √/√ 50% $0.60 FO30/XP/SS/ECO QTP3x32T8/UNV PSX 67 0.60 31 √/√ 53% $0.60 Open Office Retrofit Project 3-lamp Systems System Wattage Watts per sq ft F34CW/SS MB2x40/277RS & MB1x40/277RS 121 FO32/741/ECO QTP3x32T8/UNV ISN * Lighting power adjustment factors available when passive controls are used System Comparisons Open Office Retrofit Project 3-lamp Systems Ballast Factor Initial System Lumens Mean System Lumens* Lumen Maint. System Wattage** Lamp Life (12 hrs/start) FO32/741/ECO QTP3x32T8/UNV ISN 0.88 7392 (100%) 6653 (100%) 0.90 87 (100%) 24,000 FO30/XP/SS/ECO QHE3x32T8/UNV ISN 0.88 7524 (102%) 7075 (106%) 0.94 77 (89%) 30,000 FO28/XP/SS/ECO QHE3x32T8/UNV ISL 0.78 6377 (86%) 5990 (90%) 0.94 63 (72%) 30,000 FO32/XPS/ECO QTP3x32T8/UNV PSX 0.71 6603 (89%) 6273 (94%) 0.95 71 (82%) 36,000 FO30/XP/SS/ECO QTP3x32T8/UNV PSX 0.71 6071 (82%) 5708 (86%) 0.94 67 (77%) 36,000 * Mean system lumens based on light at 40% of rated life ** System wattage based on 277V 33 Open Office Retrofit Project 2x4 Parabolic Fixtures % Relative Life Cycle Cost % Relative Energy Consumption Relative Payback (years) 110% 1.5 1.37 1.34 100% 100% 100% 1.25 1.08 91% 89% 90% 1 82% 80% 78% 77% 76% 72% 70% 74% 0.5 0.47 60% 50% 0.75 0.25 0 FO32/741/ECO QTP3x 32T8/UNV ISN 0 FO30/841/XP/SS/ECO QHE 3x 32T8/UNV ISN FO28/841/XP/SS/ECO QHE 3x 32T8/UNV ISL 34 FO32/841/XPS/ECO QTP FO30/841/XP/SS/ECO 3x 32T8/UNV PSX QTP 3x 32T8/UNV PSX Energy, Economics & Light Levels Life Cycle Cost** Relative Simple Payback (Years) Lighting Power Density (W/ft2) Average Maintained Illuminance (FC) --- $32,176 (100%) --- 0.78 (100%) 37 $1,900 11% $29,321 (91%) 1.4 0.69 (88%) 38 FO28/XP/SS/ECO QHE3x32T8/UNV ISL $1,500 28% $24,536 (76%) 0.5 0.57 (73%) 32 FO32/XPS/ECO QTP3x32T8/UNV PSX $1,700 18% $25,153 (78%) 1.3 0.64 (82%) 33 FO30/XP/SS/ECO QTP3x32T8/UNV PSX $1,600 23% $23,670 (74%) 1.1 0.60 (77%) 31 Open Office Retrofit Project 3-lamp Systems Energy Cost per Year* Relative Energy Savings FO32/741/ECO QTP3x32T8/UNV ISN $2,100 FO30/XP/SS/ECO QHE3x32T8/UNV ISN * Based on $0.10/kW-h. 12 hr burn cycle per day, 5 days a week, and 50 weeks per year ** Based on AUP’s for lamps and ballasts and 60,000 hrs 35 Open Office Space: New Construction New Construction Project „ 90 ft x 100 ft ~ 9000 sq ft space „ 9.5 ft ceiling height „ 108 2-lamp direct/indirect or 81 RT5 recessed fixtures „ Target illuminance: 30-50 fc „ 80/50/20 reflectances „ 12 hrs per day, 5 days per week, 50 weeks per year Impact of Energy Codes on Open Offices „ ASHRAE/IESNA Standard 90.1 „ „ Space-by-Space Method: „ 2001 – 1.3 W/sq ft „ 2004 – 1.1 W/sq ft Building Area Method: „ 2001 – 1.3 W/sq ft „ 2004 – 1.0 W/sq ft „ CA Title 24, Part 6* „ „ Area Category Method „ 2005 – 1.2 W/sq ft Complete Building Method „ 2005 – 1.1 W/sq ft Maint. FC LEED v.2.2 Points Earned Pass/Fail ASHRAE 2001/2004** % Beats 90.1 -2001 Bldg Method (%/Ded.) 0.71 40 6 √/√ 45% $0.60 45 0.54 36 10 √/√ 58% $0.60 F028/XP/SS/ECO QHE2x32T8/UNV ISL 42 0.50 34 10 √/√ 62% $0.60 FO32/XPS/ECO QTP2x32T8/UNV PSX 46 0.55 35 10 √/√ 58% $0.60 FP28PM/ECO QS2x28T5/UNV PS95 58 0.52 47 10 √/√ 60% $0.60 Open Office New Construction 2-lamp Systems System Wattage Watts per sq ft FO32/741/ECO QTP2x32T8/UNV ISN 59 FO30/XP/SS/ECO QHE2x32T8/UNV ISL * Lighting power adjustment factors available when passive controls are used System Comparisons Open Office New Construction 2-lamp Systems Ballast Factor Initial System Lumens Mean System Lumens* Lumen Maint. System Wattage** Lamp Life (12 hrs/start) FO32/741/ECO QTP2x32T8/UNV ISN 0.88 4928 (100%) 4435 (100%) 0.90 59 (100%) 24,000 FO30/XP/SS/ECO QHE2x32T8/UNV ISL 0.78 4446 (90%) 4181 (94%) 0.94 45 (76%) 30,000 F028/XP/SS/ECO QHE2x32T8/UNV ISL 0.78 4251 (86%) 3994 (90%) 0.94 42 (71%) 30,000 FO32/XPS/ECO QTP2x32T8/UNV PSX 0.71 4402 (89%) 4182 (94%) 0.95 46 (78%) 36,000 FP28PM/ECO QS2x28T5/UNV PS95 0.95 5795 (118%) 5506 (124%) 0.95 58 (98%) 24,000 * Mean system lumens based on light at 40% of rated life ** System wattage based on 277V 38 Open Office New Construction Project Indirect Fixtures % Relative Life Cycle Cost % Relative Energy Consumption Relative Payback (years) 110% 4.5 3.99 100% 3.96 100% 4 100% 3.5 90% 3 2.77 2.5 80% 80% 2.39 76% 80% 78% 78% 76% 74% 2 71% 70% 1.5 1 60% 0.5 50% 0 FO32/741/ECO QTP3x 32T8/UNV ISN 0 FO30/841/XP/SS/ECO QHE 3x 32T8/UNV ISL FO28/841/XP/SS/ECO QHE 3x 32T8/UNV ISL FO32/841/XPS/ECO QTP 3x 32T8/UNV PSX FP28PM/ECO QS2x28T5/UNV PS95 Energy, Economics & Light Levels Life Cycle Cost** Relative Simple Payback (Years) Lighting Power Density (W/ft2) Average Maintained Illuminance (FC) --- $42,638 (100%) --- 0.92 (100%) 38 $1,460 23% $33,981 (80%) 2.8 0.54 (59%) 36 F028/XP/SS/ECO QHE2x32T8/UNV ISL $1,400 26% $32,219 (76%) 2.4 0.50 (54%) 34 FO32/XPS/ECO QTP2x32T8/UNV PSX $1,500 21% $33,269 (78%) 4.0 0.55 (60%) 35 FP28PM/ECO QS2x28T5/UNV PS95 $1,410 26% $33,933 (80%) 4.0 0.52 (57%) 47 Open Office New Construction 2-lamp Systems Energy Cost per Year* Relative Energy Savings FO32/741/ECO QTP2x32T8/UNV ISN $1,900 FO30/XP/SS/ECO QHE2x32T8/UNV ISL * Based on $0.10/kW-h. 12 hr burn cycle per day, 5 days a week, and 50 weeks per year ** Based on AUP’s for lamps and ballasts and 60,000 hrs 40 Application: Open Office Before After „ Previous Lighting „ „ Open office areas: 3-lamp parabolics with T8/electronic ballasts 2 „ approx. 1.08 w/ft (Beats 90.1-2001 by 17%) Private office areas: 2-lamp 1x4 parabolics with T8/electronic ballasts 2 „ approx. 1.48 w/ft (Beats 90.1-2001 by 1%) „ New Lighting: Recessed fixtures with 2-T5 lamps and electronic ballasts „ „ Open office areas: approx. 0.73 w/ft2(Beats 90.1-2001 by 44% - $0.60sq/ft) Private office areas: approx. 0.96 w/ft2(Beats 90.1-2001 by 36% - $0.52sq/ft) Retail Applications Retail Space: Retrofit Retrofit Project „ 62ft x 80ft ~ 4960 sq ft space „ 12 ft ceiling height „ 2-lamp 2x2 parabolic and adjustable accent fixtures „ 8 ft x 8 ft fixture spacing „ Target illuminance: 50 fc „ 80/50/20 reflectances „ 14 hrs per day, 7 days per week, 365 days per year Impact of Energy Codes on Retail „ ASHRAE/IESNA Standard 90.1 „ CA Title 24, Part 6* „ „ Area Category Method „ 2005 – 1.7 W/sq ft Complete Building Method „ 2005 – 1.5 W/sq ft System 1 System 2 „ Space-by-Space Method: „ 2001 – 2.1 W/sq ft „ 2004 – 1.7 W/sq ft Building Area Method: „ 2001 – 1.9 W/sq ft „ 2004 – 1.5 W/sq ft System 3 „ Retail Retrofit Project 2-lamp Systems * Lighting power adjustment factors available for display lighting and when passive controls are used System Wattage FT40DL/800/RS QT2x40/277 DL 75 100PAR38/CAP/IR 100 FT40DL/28W/SS/IS QT2x40/277 DL 69 MC39T6/U/G12/800 QTP1x39MH/UNV 44 FT40DL/28W/SS/IS QHE2x40DL/UNV ISN 63 MC39T6/U/G12/800 QTP1x39MH/UNV 44 Pass/ Fail ASHRAE 2001/ 2004** % Beats 90.1 -2001 Bldg Method (%/Ded.) Watts per sq ft Maint. FC LEED v.2.2 Points Earned 1.64 53 0 √/X 14% $0.00 1.18 52 4 √/√ 38% $0.55 1.10 52 5 √/√ 42% $0.60 System 3 System 2 System 1 System Comparisons Retail Retrofit Project 2-lamp Systems Ballast Factor Initial System Lumens Mean Avg. Lumen System Rated Life System Maint. Wattage** (hrs) Lumens* FT40DL/800/RS QT2x40/277 DL 0.96 6045 5201 0.86 75 15,000t 100PAR38/CAP/IR --- 2070tt --- --- 100 3000 FT40DL/28W/SS/IS QT2x40/277 DL 1.08 6048 5322 0.88 69 20,000t MC39T6/U/G12/800 QTP1x39MH/UNV 1.00 3400tt 2720 0.80 44 12,000 FT40DL/28W/SS/IS QHE2x40DL/UNV ISN 1.07 5990 5271 0.92 63 20,000t MC39T6/U/G12/800 QTP1x39MH/UNV 1.00 3400tt 2720 0.80 44 12,000 * Mean system lumens based on light at 40% of rated life for CFL/HID products and end of life for halogen products ** System wattage based on 277V tt Actual lumens vary depending on fixture efficiencies (Assumed efficiencies: halogen lamps 0.94 and HID lamps 0.80 t Lamp life rating at 12 hrs/start 45 Retail Retrofit Project 2x2 Parabolic and Adjustable Accent Fixtures % Relative Life Cycle Cost % Relative Energy Consumption Relative Payback (years) 110% 3 2.62 100% 100% 100% 2.5 2.38 90% 2 80% 1.5 72% 72% 69% 70% 67% 60% 50% 1 0.5 0 FT40DL/800/RS QT3x40/277 DL w ith 100PAR38/CAP/IR 0 FT40DL/28W /SS/IS QT2x40/277 DL w ith MC39T6/U/G12/800 QTP1x39MH/UNV FT40DL/28W /SS/IS QHE2x40DL/UNV ISN w ith MC39T6/U/G12/800 QTP1x39MH/UNV Energy, Economics & Light Levels System 3 System 2 System 1 Retail Retrofit Project 3-lamp Systems FT40DL/800/RS QT3x40/277 DL Energy Relative Cost per Energy Year* Savings MC39T6/U/G12/800 QTP1x39MH/UNV FT40DL/28W/SS/IS QHE3x40DL/UNV ISN MC39T6/U/G12/800 QTP1x39MH/UNV Relative Simple Payback (Years) Lighting Power Density (W/ft2) Average Maintained Illuminance (FC) $4,150 --- $69,200 (100%) --- 1.64 (100%) 53 $3,000 28% $49,600 (72%) 2.6 1.18 (72%) 52 $2,800 33% $47,500 (69%) 2.4 1.10 (67%) 52 100PAR38/CAP/IR FT40DL/28W/SS/IS QT3x40/277 DL Life Cycle Cost** * Based on $0.10/kW-h. 14 hr burn cycle per day, 7 days a week, and 52 weeks per year ** Based on AUP’s for lamps and ballasts and 60,000 hrs 47